INSP-Final Inspection | 3/30/2009 | 3/31/2009 | 3/31/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/30/2009 | 3/30/2009 | 3/30/2009 | P | FAIL |
Troy Cobbley
|
|
|
No testing could be completed today due to multiple problems with the pressure switches.
|
INSP-Sprinkler Rough-in/Hydro | 3/25/2009 | 3/26/2009 | 3/26/2009 | A | PASS |
Troy Cobbley
|
|
|
All items have been corrected except the interconnection/operation of the pre-action system.
|
INSP-Sprinkler Rough-in/Hydro | 3/25/2009 | 3/25/2009 | 3/25/2009 | A | PART |
Troy Cobbley
|
|
|
There are four deficiencies prior to final sign off. The heads at the top and bottom of the elevator shaft are not oriented correctly. The sprinkler piping to the head at the bottom of the shaft is not secured and needs a cage. One head on the second floor is bent and needs replaced and one upright sprinkler head in a warehouse storage room is blocked by a pendant light. Also the pre-action system has not been tested. The other deficiencies have been corrected and marked off on the city approved plans.
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2009 | 3/13/2009 | 3/13/2009 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2009 | 2/23/2009 | 2/23/2009 | A | FAIL |
Troy Cobbley
|
|
|
The insulation had not been addressed on the second floor mezzanine so the inspection was stopped until all items are addressed. Per the contractor other areas will be ready at the next inspection.
|
INSP-Sprinkler Rough-in/Hydro | 2/20/2009 | 2/20/2009 | 2/20/2009 | P | PART |
Troy Cobbley
|
|
|
See the city approved plans for locations on the second floor where corrections are needed.
|
Miscellaneous action | | | 2/20/2009 | | DONE |
Tim Frost
|
|
|
Approved Flame Stop IM (Intumescent Paint) for use to treat the combustible wood above the ceiling. See attached email in pdf format. The product must be installed as per manufactuer data sheet. This sheet is also attached.
|
INSP-Sprinkler Rough-in/Hydro | 2/3/2009 | 2/4/2009 | 2/4/2009 | A | DONE |
Troy Cobbley
|
|
|
This inspection was actually a conference to see where combustibles above the ceiling had been covered with drywall and areas that had not been covered yet.
|
INSP-Sprinkler Rough-in/Hydro | 1/12/2009 | 1/12/2009 | 1/12/2009 | P | PASS |
Troy Cobbley
|
|
|
The rough-in for the pre-action system passed. the hydro test passed.
|
CHANGE STATUS TO (ISS) | | | 1/6/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/6/2009 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/30/2008 | | 12/30/2008 | | PASS |
Tim Frost
|
|
|
Please, see attached review
There ARE annotations on the plans
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/30/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/30/2008 | | DONE |
|
|
|
left vm for don curtis at ###-#### - permit ready (resubmittal) and fees given
|
Permit Ready to Issue | | | 12/30/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/19/2008 | | DONE |
|
|
|
Received 1 application,3 copies of system configurations & 3 copies of sheets FP1,FP2 sent to fire
|
INSP-Conference | 12/18/2008 | 12/18/2008 | 12/18/2008 | P | DONE |
Troy Cobbley
|
|
|
I deferred the sprinkler design questions to tim frost. This is a fully sprinklered building but there is exposed wood in the above ceiling area.
|
Inspection Record Card- Fire | 12/17/2008 | | 12/17/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/17/2008 | | DONE |
|
|
|
t/c w don curtis at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/17/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/17/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 12/16/2008 | | PASS |
|
|
|
Field Inspector to verify some items. See annotations on plans. Spacing and wall configurations in one area and size of existing outlets for uprights.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/16/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/12/2008 | | |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/11/2008 | | 12/11/2008 | | FAIL |
Tim Frost
|
|
|
See attached comments
|
Telephone call | | | 12/11/2008 | | DONE |
|
|
|
Called contractor and asked him what he wanted me to do with the rejected plans. Did he want to pick them up since there were not any comments.
|
Telephone call | | | 12/11/2008 | | DONE |
|
|
|
Faxed review to contractor. (Resubmittal Required)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2008 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 12/11/2008 | | 12/11/2008 | | DONE |
Cathy Brown
|
|
|
|
Plan resubmittals received | | | 12/5/2008 | | |
|
|
|
received "3" sheets each of FP1 & FP2 & "3" sets of fire apps-- put plans on fire shelf
|
Sprinkler Plan Check | | | 12/1/2008 | | FAIL |
|
|
|
See comments
|
Miscellaneous action | | | 12/1/2008 | | DONE |
|
|
|
Faxed review comments to contractor.
|
Telephone call | | | 12/1/2008 | | DONE |
|
|
|
I spoke with Don Curtis to let him know the plans had been denied. I informed him there were no redlines on the plans and asked if he would like me to discard the plans or if he would like to come pick them up. He asked me to discard them.
|
Application received | | | 11/18/2008 | | |
|
|
|
|
Pending Assignment by SAM | 11/18/2008 | | 11/18/2008 | | DONE |
Tim Frost
|
|
|
|
Case Summary | | | 11/18/2008 | | DONE |
|
|
|
|