INSP-Final Inspection | 4/27/2009 | 4/28/2009 | 4/28/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 4/23/2009 | 4/27/2009 | 4/27/2009 | P | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Sprinkler Rough-in | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | PASS |
Troy Cobbley
|
|
|
Per Tim Frost the deficiencies have been corrected and the sprinkler piping can be covered.
|
CHANGE STATUS TO (ISS) | | | 3/4/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 3/4/2009 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 2/26/2009 | | 3/3/2009 | | PASS |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/3/2009 | | 3/3/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/3/2009 | | 3/3/2009 | | DONE |
|
|
|
|
Telephone call | | | 3/3/2009 | | DONE |
|
|
|
t/c w cameron hess at ###-#### - resubmittal ready
|
Permit Ready to Issue | | | 3/3/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/26/2009 | | |
Tim Frost
|
|
|
Plan Modification: Recieved application, three copies of submittal package, and sheet FP1 of 1; taken to Fire Review
|
INSP-Sprinkler Rough-in/Hydro | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | FAIL |
Troy Cobbley
|
|
|
One additional head required above the stairway for proper coverage. 1" install on the second floor when the plan indicates 1 1/4" Main shifted approximately 5' on the second floor. Shifting the mains affected the hydraulic most remote area. One head was leaking and was being replaced on the second floor. Resubmittal of plans is required. Tim Frost
|
Override - Parcel Holds | | | 12/10/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 12/10/2008 | | |
|
|
|
|
Issue and Print Permit | | | 12/10/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/9/2008 | | DONE |
|
|
|
t/c w cameron hess at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 12/9/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 12/9/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 12/9/2008 | | DONE |
|
|
|
|
Sprinkler Plan Check | | | 12/5/2008 | | PASS |
|
|
|
Approved with annotations and comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/5/2008 | | DONE |
|
|
|
Told contractor that the plans were approved however, they had to make sure that the heads were no closer than 8' apart in the coffee room to prevent cold sodering.
|
Override - Parcel Holds | | | 12/5/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 12/5/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 12/5/2008 | | 12/5/2008 | | DONE |
Cathy Brown
|
|
|
|
Application received | | | 11/24/2008 | | |
|
|
|
|
Pending Assignment by SAM | 11/24/2008 | | 11/24/2008 | | DONE |
Tim Frost
|
|
|
|