Permit Information
Permit NumberFIR08-00801
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 1620 W RIVER ST
Project NameINTERFAITH SANCTUARY
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of installing 6" underground C-900 into the building. An additional permit will follow that includes modifications to the existing fire protection system.

Associated building permit BLD08-02236 (INTERFAITH SANCTUARY) To remodel an existing 9833 sq ft. homeless shelter this project is to be done in phases this is the first phase. Work to include, connecting the existing fire sprinkler system to a water supply, installation of a new fire alarm system, construction of interior partitions to create an exit corridor, There will be an Upgrade Agreement to complete the remainder of the work required in the building. Temporary occupancy of this structure was allowed under permit MIS07-00226. NOTE: SEPARATE PERMITS WILL BE REQUIRED FOR THE FIRE SPRINKLER WORK AND TO INSTALL FIRE ALARM SYSTEM. This building will be fully fire sprinklered and will have a fire alarm system under phase. RMH

System Design History
There is an existing fire protection system without a permanent supply. The only supply at this time is from a FDC.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/10/2009 DONE
Sent for archiving
INSP-Final Inspection2/26/20092/26/20092/26/2009PPASS
DetailsTroy Cobbley
permit finaled
Miscellaneous action  2/13/2009 DONE
Approval given by Fire Marshal, Mark Senteno, to charge the system prior to fire alarm monitoring being in service. per following email
Mr. Larson,

I am giving you permission to activate the sprinkler system (FIR08-00801, FIR09-00003) located at 1620 West River Street. I understand that by doing so, the sprinkler system will operate as designed. I also understand that the fire alarm system is not currently monitored.

Activating the sprinkler system will afford the occupants a great degree safety in the event of a fire. The Interfaith Sanctuary has staff working 24 hours a day and provides fire watch while the alarm system is being completed.

If you have any questions please contact me.

Respectfully,

Mark Senteno
Fire Marshal
Boise City Fire Department
150 North Capitol Blvd.
Boise, Idaho 83702

(O) ###-####
(C) 208-869 7908
Telephone call  2/11/2009 DONE
telcon with Ron Larson, Viking, (###-####) who indicated the sprinkler riser is completed and connected to the underground. They are just waiting for the fire alarm system to be completed to provide monitoring before they charge the system with water.
INSP-Supply line flush1/30/20091/30/20091/30/2009PPART
DetailsForrest France
UG fire supply line flush completed satisfactory.
INSP-Supply line flush1/8/20091/9/20091/9/2009PPART
DetailsForrest France
UG fire supply line hydrostatic test passed. Also okayed UG install for bury.
Issue and Print Permit  12/5/2008 DONE
Sprinkler Plan Check  12/4/2008 DONE
DetailsTim Frost
Approved with Comments
PLANS/APPL TAKEN TO FRONT DESK  12/4/2008 DONE
Inspection Record Card- Fire12/4/2008 12/4/2008 DONE
DetailsCathy Brown
Telephone call  12/4/2008 DONE
DetailsCathy Brown
tlk to ron larson ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  12/4/2008 DONE
DetailsCathy Brown
Case Summary  12/3/2008  
Application received  12/3/2008  
Pending Assignment by SAM12/3/2008 12/3/2008 PASS
DetailsTim Frost
Plan assigned to (SAM)12/3/2008    
DetailsSam Rogers