INSP-Final Inspection | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | PASS |
Forrest France
|
|
|
Fire alarm testing passed, permit finaled.
|
INSP-Final Inspection | 2/18/2009 | 2/18/2009 | 2/18/2009 | A | CANC |
Forrest France
|
|
|
Please call 30 min prior to arrival. Phone #: ###-#### Internet Inspection Request from: Jeff Walton
|
Issue and Print Permit | | | 12/8/2008 | | DONE |
Rita DeYoung
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2008 | | DONE |
|
|
|
|
Plan assigned to (Scott) | | | 12/4/2008 | | DONE |
Sam Rogers
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (SAM) | | | 12/4/2008 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|
Alarm Plan Check | | | 12/4/2008 | | PASS |
|
|
|
Micron site visit. Passed subject to Comment: fire inspector to witness field measurement of standby and alarm loads on new VESDA/FAC panel, to verify battery calc's and adequate battery size.
|