Miscellaneous action | | | 1/5/2010 | | DONE |
Tim Frost
|
|
|
Drawings sent for scanning.
|
Miscellaneous action | | | 3/11/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 1/21/2009 | 1/21/2009 | 1/21/2009 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/21/2009 | 1/21/2009 | 1/21/2009 | A | PASS |
Forrest France
|
|
|
Correction verified for completion, inspection passed.
|
INSP-Final Inspection | 1/2/2009 | 1/5/2009 | 1/5/2009 | P | PART |
Forrest France
|
|
|
Scope of work inspected and approved however, noted one obstructed head at the NE corner of the computer/server room to be adjusted for correct coverage prior to this permit final. See plans for annotated location with today's date.
|
Sprinkler Plan Check | 12/12/2008 | | 12/12/2008 | | PASS |
Tim Frost
|
|
|
Field check annotations on plans
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/12/2008 | | 12/12/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/12/2008 | | DONE |
|
|
|
tim brought this down for fees and an inspection card - he called brodie to come pick them up
|
Permit Ready to Issue | | | 12/12/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/12/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Application received | | | 12/8/2008 | | |
|
|
|
|
Pending Assignment by SAM | 12/8/2008 | | 12/8/2008 | | DONE |
Tim Frost
|
|
|
|
Case Summary | | | 12/8/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|