INSP-Final Inspection | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | PASS |
Forrest France
|
|
|
Correction notice items field verified for completion, fire sprinkler permit work finaled.
|
INSP-Final Inspection | 9/3/2009 | 9/3/2009 | 9/3/2009 | A | FAIL |
Forrest France
|
|
|
Need to remove travel cap and install escutcheon at one pendent head at a first floor bedroom, replace one exposed recessed head with the correct type for the application, repair non-functional outside bell, provide missing sprinklers at the head box, lock or seal control valves in the open position at the backflow preventer.
|
INSP-Final Inspection | 9/2/2009 | 9/3/2009 | 9/3/2009 | A | CANC |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|
INSP-Final Inspection | 9/3/2009 | 9/4/2009 | 9/3/2009 | A | CANC |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|
INSP-Final Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 | P | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Sprinkler Rough-in/Hydro | 2/12/2009 | 2/13/2009 | 2/13/2009 | A | PART |
Forrest France
|
|
|
Overhead rough-in okayed for cover, be aware of possible obstructions to sprinkler discharge that may develop due to proximity to light fixtures, ceiling fans, structural finishes, etc. when installed. Follow obstruction tables per NFPA 13 for residential head spacing.
|
INSP-Sprinkler Rough-in/Hydro | 2/11/2009 | 2/12/2009 | 2/12/2009 | A | PART |
Forrest France
|
|
|
Okay to cover overhead install with the exception of three locations including first floor water closet where tenting is inadequate for the sprinkler drop, head adjacent to the basement spiral stairway not yet installed, and an overspaced pendent head at a basement bedroom. Remainder of correction items noted on 2/11 repaired. Contractor to maintain adequate cold cavity protection throughout the attic spaces.
|
INSP-Sprinkler Rough-in | 2/10/2009 | 2/11/2009 | 2/11/2009 | A | FAIL |
Troy Cobbley
|
|
|
See city approved plans for deffinices noted which include over spaced heads and inadequate tenting. Incorrect back flow preventer installed. No approval to cover piping at this time was given.
|
INSP-Sprinkler Rough-in | 2/6/2009 | 2/10/2009 | 2/10/2009 | P | CANC |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|
INSP-Sprinkler Rough-in | 2/5/2009 | 2/6/2009 | 2/6/2009 | P | CANC |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|
INSP-Sprinkler Rough-in/Hydro | 2/2/2009 | 2/2/2009 | 2/2/2009 | A | PART |
Forrest France
|
|
|
Okay to cover branch line piping above the main entry vestibule as discussed.
|
INSP-Supply line flush | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PART |
Forrest France
|
|
|
Inspection intended for OH cover at the main entry vestibule- cover approved, discussed freeze protection for piping installed- will need stamped plan set on site at next site visit.
|
Issue and Print Permit | | | 1/15/2009 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/9/2009 | | 1/9/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2009 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/9/2009 | | 1/9/2009 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 1/9/2009 | | DONE |
Cathy Brown
|
|
|
tlk to commercial fire ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/9/2009 | | DONE |
Cathy Brown
|
|
|
|
Plan resubmittals received | | | 1/8/2009 | | |
Sam Rogers
|
|
|
Rec'd plan mod- three copies of application and plans
|
Sprinkler Plan Check | 1/2/2009 | | 1/2/2009 | | FAIL |
Tim Frost
|
|
|
See attached comments.
There ARE annotations on the plans.
|
Miscellaneous action | | | 1/2/2009 | | DONE |
|
|
|
Sent email of pdf comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/2/2009 | | DONE |
Tim Frost
|
|
|
|
Pending Assignment by SAM | 1/2/2009 | | 1/2/2009 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 1/2/2009 | | DONE |
|
|
|
called commercial fire ###-#### 1:45 pm that permit has failed
|
Plan resubmittals received | | | 12/31/2008 | | |
Sam Rogers
|
|
|
plan mod rec'd- three copies of app, submittla info and plan- taken to fire review
|
Plan assigned to (SAM) | 12/31/2008 | | 12/31/2008 | | DONE |
Sam Rogers
|
|
|
|
Sprinkler Plan Check | 12/12/2008 | | 12/12/2008 | | FAIL |
Tim Frost
|
|
|
See attached comments. There are no annotations on the review plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2008 | | DONE |
|
|
|
|
Pending Assignment by SAM | 12/12/2008 | | 12/12/2008 | | DONE |
Cathy Brown
|
|
|
|
Application received | | | 12/10/2008 | | |
|
|
|
|
Case Summary | | | 12/10/2008 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 12/10/2008 | | 12/10/2008 | | DONE |
Sam Rogers
|
|
|
|