Miscellaneous action | | | 12/1/2010 | | DONE |
|
|
|
Plans taken to records for scanning
|
INSP-Final Inspection | 10/26/2010 | 10/27/2010 | 10/28/2010 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled, inspection passed.
|
FIR-Aging Inspection | 9/17/2010 | 9/17/2010 | 9/23/2010 | | FAIL |
Forrest France
|
|
|
|
FIR-Aging Inspection | 6/29/2010 | 6/29/2010 | 6/29/2010 | | FAIL |
Forrest France
|
|
|
Need to provide satisfactory netcon rating.
|
INSP-Final Inspection | 6/9/2009 | 6/11/2009 | 6/11/2009 | P | FAIL |
Troy Cobbley
|
|
|
No testing was performed since a NetCom 5 or better was not available. I spoke to Stan Watts with AES and he stated that per UL a NetCom of 5 or better is required and this is backed up by the installation guide provided via email and forwarded to the fire alarm plan reviewer.
|
FIR-Aging Inspection | 3/24/2009 | 3/24/2009 | 3/24/2009 | | DONE |
Forrest France
|
|
|
Need site inspection for work completed when finished.
|
Alarm Plan Check | | | 12/17/2008 | | PASS |
|
|
|
see review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/17/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/17/2008 | | 12/17/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/17/2008 | | DONE |
|
|
|
left vm for lori at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 12/17/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/17/2008 | | DONE |
|
|
|
|
Application received | | | 12/11/2008 | | |
|
|
|
|
Plan assigned to (Stephanie) | 12/11/2008 | | 12/11/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Case Summary | | | 12/11/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|