Miscellaneous action | | | 5/11/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Alarm Testing | 1/14/2009 | 1/15/2009 | 1/15/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 1/9/2009 | 1/12/2009 | 1/12/2009 | P | FAIL |
Troy Cobbley
|
|
|
The fire alarm system functioned correctly but the outside alarm bell did not activate upon water flow.
|
INSP-Final Inspection | 1/8/2009 | 1/9/2009 | 1/9/2009 | P | FAIL |
Troy Cobbley
|
|
|
No inspection was performed due to the phone lines not indicating or reporting trouble signals. I did do a conference with Vern the owner of Bob's Cycles.
|
Issue and Print Permit | | | 1/8/2009 | | DONE |
|
|
|
|
Alarm Plan Check | | | 1/5/2009 | | PASS |
|
|
|
see review comments and redlines
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2009 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/5/2009 | | 1/5/2009 | | DONE |
|
|
|
|
Telephone call | | | 1/5/2009 | | DONE |
|
|
|
t/c w rand gruber at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 1/5/2009 | | DONE |
|
|
|
|
Application received | | | 12/23/2008 | | |
|
|
|
|
Plan assigned to (Stephanie) | 12/23/2008 | | 12/23/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|