INSP-Sprinkler Rough-in/Hydro | 3/10/2009 | 3/11/2009 | 3/11/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/10/2009 | 3/11/2009 | 3/11/2009 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro test passed.
|
CHANGE STATUS TO (ISS) | | | 3/10/2009 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 3/10/2009 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 2/13/2009 | | 2/26/2009 | | PASS |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/26/2009 | | 2/26/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/26/2009 | | 2/26/2009 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2009 | | DONE |
|
|
|
left message w bernie for john at ###-#### - permit ready (resubmittal)
|
Permit Ready to Issue | | | 2/26/2009 | | DONE |
|
|
|
|
Telephone call | | | 2/17/2009 | | DONE |
Tim Frost
|
|
|
Asked John to let me know if the freezer had self closing doors. If they are self closing doors he could calculated the largest and most remote room.
|
Case Summary | | | 2/13/2009 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 2/5/2009 | 2/6/2009 | 2/6/2009 | A | FAIL |
Troy Cobbley
|
|
|
Provide a hydro test for the new portion of the sprinkler system since it includes 22 sprinkler heads and can be isolated. Provide as-builts showing the piping changes and the additional pendants in the remote area. Replace the flat face(hex)bushings and provide on piece reducing fittings. Provide access to the inside of the coolers to verify storage heights and sprinkler obstructions. Provide verification of the annual inspection on the sprinkler system.
|
INSP-Sprinkler Rough-in | 2/5/2009 | 2/6/2009 | 2/5/2009 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|
Issue and Print Permit | | | 1/15/2009 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/12/2009 | | 1/12/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments
There are NO annotations on the plans.
|
Inspection Record Card- Fire | 1/12/2009 | | 1/12/2009 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 1/12/2009 | | DONE |
Cathy Brown
|
|
|
tlk to commercial fire ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/12/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/8/2009 | | |
Sam Rogers
|
|
|
plan mod rec'd- three copies of application and plans
|
Sprinkler Plan Check | 1/5/2009 | | 1/5/2009 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/5/2009 | | DONE |
|
|
|
Sent email of review report
|
Telephone call | | | 1/5/2009 | | DONE |
|
|
|
t/c w john at ###-#### - permit denied - needs to be picked up and resubmitted
|
Application received | | | 12/31/2008 | | |
|
|
|
|
Pending Assignment by SAM | 12/31/2008 | | 12/31/2008 | | |
|
|
|
|