Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberFIR09-00019
StatusFinaled
Name STATEFIRE DC SPECIALITIES
Site Address 3485 N COLE RD
Project NameCOLE VILLAGE-POST OFFICE T.I.
Customer Number 
ePlanReview 
Description
This fire alarm permit is to replace the existing fire alarm panel with new. There are currently two panels; an existing DMP panel that serves as the dialing panel and an existing FACP. The DMP monitors the existing sprinkler system as well as monitors the existing FACP for alarm, trouble, and supervisory. The existing fire alarm control panel does not have the capacity to accommodate the tenant area devices, so it is being replaced with new. The existing notification devices are being replaced with compatible devices. The DMP panel will remain as the main dialing panel and will continue to function as monitoring the sprinkler system and the new FACP's alarm, trouble, and supervisory.

Associated building permit: BLD08-01791 (US POSTAL SERVICE - EXPANSION) This building is fire sprinklered for building area increase. To expand an existing 15,236 square foot US Postal Service tenant space (12,123 square foot existing interior area, 440 square foot canopy, 2,100 square foot canopy, and 573 square foot loading dock) into an adjacent 3,959 square foot interior area. After the expansion, this tenant space will have a total floor area of about 19,195 square feet. Work is to include upgrading 2 existing restrooms to be accessible to the disabled, enlarging an existing exterior door, and constructing a new nonbearing interior wall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  5/11/2009 DONE
Plans taken to records to scan
INSP-Final Inspection4/22/20094/23/20094/23/2009APASS
DetailsTroy Cobbley
Permit finaled.
INSP-Alarm Testing4/21/20094/22/20094/22/2009APASS
DetailsTroy Cobbley
Permit finaled.
INSP-Final Inspection4/20/20094/21/20094/21/2009AFAIL
DetailsTroy Cobbley
The flow switches still need to be tested, the new trouble signal did not report to the DMP panel and the horn/strobe circuit shut off on its own twice.
INSP-Final Inspection4/20/20094/20/20094/20/2009PCANC
DetailsTroy Cobbley
Could not perform the inspection due to time constraints. Billy will reschedule for tomorrow.
INSP-Final Inspection4/16/20094/17/20094/17/2009AFAIL
DetailsTroy Cobbley
A trouble signal is needed from the new panel to the existing facp, several strobes are overspaced, an updated map is needed at the existing and the new facp, the existing backflow gate valves need to be adjusted, the existing sprinkler flow switch needs to be tested and as-builts showing the changes need to be provided.
Telephone call  4/8/2009 DONE
Spoke with Billy regarding pull station located at the center door for the three entrances. The stripping available to mount the device to is not sturdy. Billy requested mounting the pull station on the wall within 5' on the 'hinge' side of the door. I let him know that would be acceptable.
Alarm Plan Check4/2/2009 4/2/2009 PASS
DetailsStephanie L. Cobbley
See redlines and review comments
PLANS TAKEN FRONT DESK ALARM  4/2/2009 DONE
Approved redlined plans available at front counter
Inspection Record Card- Fire4/2/2009 4/2/2009 DONE
Details
Telephone call  4/2/2009 DONE
Details
left message w mary for billy at ###-#### - permit ready and fees given
Permit Ready to Issue  4/2/2009 DONE
Details
Issue and Print Permit  4/2/2009 DONE
DetailsTisha Gallop
Plan resubmittals received  3/25/2009  
DetailsStephanie L. Cobbley
Telephone call  2/18/2009 DONE
Details
t/c w billy ellison at ###-#### - reminded him that the permit has failed and needs to be picked up
Alarm Plan Check  1/21/2009 FAIL
see review comments and redlined drawings
PLANS/APPL TAKEN TO FRONT DESK  1/21/2009 DONE
Miscellaneous action  1/21/2009 DONE
review comments faxed to contractor
Application received  1/13/2009  
Plan assigned to (Stephanie)1/13/2009 1/13/2009 DONE
DetailsStephanie L. Cobbley