Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR09-00061
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 11311 W CHINDEN BLVD
Project NameHP BLD #3, 2ND LEVEL
Customer Number 
ePlanReview 
Description
This fire alarm permit is to relocate/add/delete notification as needed due to a tenant remodel. No initiating devices are part of this permit scope.

Associated building permit: BLD09-00062 (Hewlett Packard building #3, 2nd level) Permit for minor tenant improvements to an existing tenant space with no change in occupancy class or load. Work to include the addition of 6 new conference rooms approximately 100 square feet in area per conference room with associated doors, hardware and related interior finishes. All walls are to be constructed of non-combustible materials. All work to be done per the approved plans. This is a fully sprinklered building, any alterations to the sprinkler system will require a separate permit and shall comply with NFPA#13 as regulated by the City of Boise Fire Department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/3/2009 DONE
Taken to records for scanning
INSP-Final Inspection5/11/20095/12/20095/12/2009APASS
DetailsTroy Cobbley
permit finaled
INSP-Alarm Testing5/8/20095/11/20095/11/2009APASS
DetailsTroy Cobbley
Permit finaled. The scope of work has been modified as requested.
INSP-Alarm Testing5/6/20095/7/20095/7/2009ACANC
DetailsTroy Cobbley
To be rescheduled per Darren.
(F) Reprint permit  5/5/2009 DONE
CHANGE STATUS TO (ISS)  5/5/2009 DONE
Plan assigned to (Stephanie)4/28/2009 5/1/2009 DONE
DetailsStephanie L. Cobbley
5/1/2009 15:48:55 SLC - activity updated through activity FIRA24 from case FIR09-00061.
Alarm Plan Check5/1/2009 5/1/2009 PASS
DetailsStephanie L. Cobbley
See review comments
PLANS TAKEN FRONT DESK ALARM  5/1/2009 DONE
Approved plans available at front counter
Telephone call  5/1/2009 DONE
Details
left vm for charlie at ###-#### - permit (resubmittal) ready
Permit Ready to Issue  5/1/2009 DONE
Details
Plan resubmittals received  4/28/2009  
DetailsStephanie L. Cobbley
INSP-Alarm Testing3/31/20094/1/20094/1/2009APART
DetailsTroy Cobbley
The notification devices operated in the six new office/meeting rooms. Plan resubmittals are required due to another area to the south, sheet 5 of 5, where work has not been performed. Per the personell on site this work is not going to be performed which changes the scope of work for the fire alarm permit thus the reason for the resubmittal. The other reason is instead of 15cd strobes being installed in the six rooms 30cd strobes have been installed which changes the battery and EOL calculations.
INSP-Alarm Testing3/30/20093/31/20093/31/2009ACANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 3/30/2009 at 3:21:50 PM. Contact: ###-####.
Issue and Print Permit  2/2/2009  
DetailsAlexandra L. DeYoung
Alarm Plan Check  1/29/2009 PASS
See review comments
PLANS/APPL TAKEN TO FRONT DESK  1/29/2009 DONE
Approved plans available at counter for pick-up
Inspection Record Card- Fire1/29/2009 1/29/2009 DONE
Details
Telephone call  1/29/2009 DONE
Details
left vm for charlie at ###-#### - permit ready and fees given
Permit Ready to Issue  1/29/2009 DONE
Details
Application received  1/23/2009  
Plan assigned to (Stephanie)1/23/2009 1/23/2009 DONE
DetailsStephanie L. Cobbley