Miscellaneous action | | | 5/11/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 4/8/2009 | 4/9/2009 | 4/9/2009 | P | PASS |
Forrest France
|
|
|
Corrections field verified, as-builts okayed, EOL voltage drop is acceptable, fire alarm permit finaled.
|
INSP-Final Inspection | 4/7/2009 | 4/8/2009 | 4/8/2009 | A | FAIL |
Forrest France
|
|
|
Need to install a WP notification appliance as per approved plans in the beer cooler, HS at the refrigeration equipment mechanical room is obstructed, missing coverage at the deli counter food preparation room, coverage between ceiling mount 115cd strobes at the sales floor between ceiling elevation changes/obstruction to be verified during functional test.
|
INSP-Final Inspection | 4/3/2009 | 4/7/2009 | 4/7/2009 | A | CANC |
Forrest France
|
|
|
Inspection rescheduled 4/8.
|
INSP-Final Inspection | 4/2/2009 | 4/3/2009 | 4/3/2009 | A | CANC |
Troy Cobbley
|
|
|
Per mike this will be rescheduled for tuesday morning.
|
Issue and Print Permit | | | 3/2/2009 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 2/23/2009 | | 2/27/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 2/27/2009 | | 2/27/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
See review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2009 | | DONE |
|
|
|
Approved plans available at front counter
|
Inspection Record Card- Fire | 2/27/2009 | | 2/27/2009 | | DONE |
|
|
|
|
Telephone call | | | 2/27/2009 | | DONE |
|
|
|
t/c w ken at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/27/2009 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 1/27/2009 | | 2/5/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 2/5/2009 | | DONE |
|
|
|
Spoke with Mike at Allied Gen. to go over the discrepencies in the plans. It was concluded that they would need to resubmit the plans.
|
Alarm Plan Check | | | 2/5/2009 | | FAIL |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2009 | | DONE |
|
|
|
Denied plans available at front counter for contractor pick-up
|
Miscellaneous action | | | 2/5/2009 | | DONE |
|
|
|
Faxed review comments to Allied General
|
Application received | | | 1/27/2009 | | |
|
|
|
|