12/23/10 PLAN MODFICIATION #2 (4 Initiating devices affected): This plan modification is to relocate the existing pull station, show the existing duct detectors and their locations (not indicated on previous submittals), and provide corrected zone configurations.

11/29/10 PLAN MODIFICATION (10 Initiating devices affected): This plan modification is to include connections to a new fire pump, modify the location of the AES, and to relocate the existing fire alarm panel. An IntelliTap is being provided with this AES panel.

2/9/09:
This fire alarm permit is to replace the DACT (phone lines) functions with RF Radio for monitoring. There is no associated building permit.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  6/15/2011 DONE
Drawings taken to records for scanning.
INSP-Final Inspection2/17/20112/17/20112/17/2011PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection2/15/20112/15/20112/15/2011PFAIL
DetailsTroy Cobbley
The tamper switches tested ok but came in on the same zone the the map indicated that the duct smoke detectors were on. So we tested two of the four duct smoke detectors and found that they havent been connected to the FACP. The duct detectors need to be connected to the FACP and the map corrected.
INSP-Final Inspection2/14/20112/15/20112/15/2011ACANC
DetailsTroy Cobbley
I called Bryan at ###-#### twice before going to the project and once after I arrived at the project but did not contact him. I left messages. No inspection was performed.
INSP-Final Inspection2/4/20112/7/20112/7/2011AFAIL
DetailsTroy Cobbley
Three tamper switches need to be adjusted. This includes two in the valve pit and one on the jockey pump.
INSP-Final Inspection2/2/20112/3/20112/3/2011PCANC
DetailsTroy Cobbley
Cancelled due to time constraints with micron plan review and inspection work load. Also per Guy, the fire sprinkler contractor needed to get setup for the phase reversal and loss of power signals. Will probably be rescheduled for next week.
CHANGE STATUS TO (ISS)  12/27/2010 DONE
(F) Reprint permit  12/27/2010 DONE
Plan assigned to (Stephanie)12/23/2010 12/23/2010 DONE
DetailsStephanie L. Cobbley
Alarm Plan Check12/23/2010 12/23/2010 PASS
DetailsStephanie L. Cobbley
Plan mod #2 approved. see review comments
PLANS TAKEN FRONT DESK ALARM  12/23/2010 DONE
Plan modification #2 approved plans available at front counter.
Inspection Record Card- Fire12/23/2010 12/23/2010 DONE
DetailsPatricia Smith
Telephone call  12/23/2010 DONE
t/c w lori - permit (plan mod) ready and fees given
Permit Ready to Issue  12/23/2010 DONE
Details
Plan resubmittals received  12/20/2010 DONE
DetailsChristina Prado
Recieved 2 copies of application & checklist. Also Drawings F-1 & F-2 and site plan information;routed to fire review
Issue and Print Permit  11/30/2010 DONE
Alarm Plan Check11/29/2010 11/29/2010 PASS
DetailsStephanie L. Cobbley
Plan modifications approved
PLANS TAKEN FRONT DESK ALARM  11/29/2010 DONE
Approved plan modification plans available at front counter
Inspection Record Card- Fire11/29/2010 11/29/2010 DONE
DetailsPatricia Smith
Telephone call  11/29/2010 DONE
t/c w lori - permit (plan mod) ready and fees given
Permit Ready to Issue  11/29/2010 DONE
Details
Plan assigned to (Stephanie)11/22/2010 11/29/2010 DONE
DetailsStephanie L. Cobbley
Telephone call  11/24/2010 DONE
Left Alarmco a message letting them know that the plan modifications did not contain any of the AES information in the submittal packets and that this would need to be either faxed or emailed over before I can approve the plans.
Plan resubmittals received  11/22/2010 DONE
DetailsTisha Gallop
Plan modification: received two copies of application, submittal documents and plan; routed to fire review
INSP-Final Inspection11/15/201011/15/201011/15/2010PFAIL
DetailsTroy Cobbley
After arriving on site it was determined that this permit will be postponed due to a plan modification being performed to include additional fire alarm work.
Miscellaneous action  11/15/2010 DONE
After discussions with Lori, a plan modification will be submitted prior to calling for a final inspection to include relocating the AES and the FACP, tie in connections from a new fire pump, and ensure all existing sprinkler devices are tied in to the existing panel.
FIR-Aging Inspection10/27/201010/27/201010/28/2010 NR
DetailsTroy Cobbley
Work is in progress. Per Guy all of these AES inspections are being called in shortly.
FIR-Aging Inspection6/22/20106/22/20106/22/2010 FAIL
DetailsForrest France
See inspection activity 1/26/10.
INSP-Final Inspection1/25/20101/26/20101/26/2010AFAIL
DetailsForrest France
Need to provide verification that tamper switches at the pit backflow shutoff valves #1 and 2 are connected to the panel- as FLP wire is disconnected and exposed at a junction box labeled "pit valve os&y" in the riser room. Also need to retest alarm signals as the manual pull station failed to report.
INSP-Final Inspection12/8/200912/9/200912/9/2009PCANC
DetailsTroy Cobbley
Cancelled per Guy. To be rescheduled.
FIR-Aging Inspection6/23/20096/23/20096/23/2009 NR
DetailsTroy Cobbley
work is in progress
Issue and Print Permit  2/10/2009 DONE
Plan assigned to (Stephanie)1/28/2009 2/9/2009 DONE
DetailsStephanie L. Cobbley
Alarm Plan Check2/9/2009 2/9/2009 PASS
DetailsStephanie L. Cobbley
see review comments
PLANS/APPL TAKEN TO FRONT DESK  2/9/2009 DONE
approved plans available at front counter
Inspection Record Card- Fire2/9/2009 2/9/2009 DONE
Details
Telephone call  2/9/2009 DONE
Details
t/c w lori at ###-#### - permit ready and fees given
Permit Ready to Issue  2/9/2009 DONE
Details
Application received  1/28/2009