Permit Information
Permit NumberFIR09-00107
StatusFinaled
Name ALARMCO
Site Address 200 N MAPLE GROVE RD
Project NameMAPLE GROVE BUILDING
Customer Number 
ePlanReview 
Description
12/23/10: PLAN MODIFICATION (5 Initiating devices affected). This plan modification is to provide a new Fire Alarm Control Panel and connect the existing pull station and sprinkler system monitoring devices to it. No duct detectors or HVAC has been indicated. If duct detectors are required and/or provided, a plan modification shall be submitted an approved prior to calling for a final inspection. Also included in this plan modification scope of work is the addition of an IntelliTap module.

2/17/09: This fire alarm permit is to replace the DACT (phone lines) functions with RF Radio for monitoring. There is no associated building permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  2/8/2011 DONE
Plans taken to records for scanning.
INSP-Final Inspection1/11/20111/12/20111/12/2011APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/10/20111/11/20111/11/2011PCANC
DetailsTroy Cobbley
Please call Guy at ###-#### with inspection time. Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt
INSP-Final Inspection1/7/20111/7/20111/7/2011PCANC
DetailsTroy Cobbley
CARISSA had not corrdinated with Alarmco to perform this inspection. Will need to be rescheduled.
INSP-Final Inspection12/30/20101/3/20111/3/2011AFAIL
DetailsTroy Cobbley
To final this permit both flow switches and both PIV tamper switches need to be tested. The inspector test lines do not have the required orfice mounted therefore a test or these devices could not be completed.
Issue and Print Permit  12/27/2010 DONE
Alarm Plan Check12/23/2010 12/23/2010 PASS
DetailsStephanie L. Cobbley
Plan modification approved- see review comments
PLANS TAKEN FRONT DESK ALARM  12/23/2010 DONE
Approved plan modification documents available at front counter.
Inspection Record Card- Fire12/23/2010 12/23/2010 DONE
DetailsPatricia Smith
Telephone call  12/23/2010 DONE
t/c w lori - permit (plan mod) ready and fees given
Permit Ready to Issue  12/23/2010 DONE
Details
Plan resubmittals received  12/20/2010 DONE
DetailsChristina Prado
Received 1 copy of application & checklist and 2 copies of site plans;routed to fire review
Telephone call  12/17/2010 DONE
Corine with Alarmco called to discuss an issue with this permit. The original submittals indicate an AES module replacing the DACT in an existing fire alarm panel. Per an inspection, it was discovered the AES is being used as the stand alone fire alarm panel. The AES is not listed for this use, therefore I explained to Corine that a plan modification would be required to either provide a fire alarm panel or return the system to its original state. She indicated that they would be installing a new fire alarm panel. Due to a new fire alarm panel being installed, two full sets of submittals indicating items including but not limited to: the fire alarm panel, all fire alarm components, one-line, data sheets, calcs etc. that would normally be submitted for any other sprinkler monitoring system. I also stated that due to the nature of this particular project, that no work outside the originally submitted scope of work could be done until this permit plan modification has been approved. She stated that she understood and asked how long it would take to review the plans. I let her know it would be the standard ten business days.
FIR-Aging Inspection10/28/201010/28/201010/28/2010 NR
DetailsTroy Cobbley
Work is in progress. Per Guy all of these AES inspections are being called in shortly.
FIR-Aging Inspection7/7/20107/7/20107/7/2010 NR
DetailsTroy Cobbley
Per Bill the AES inspection scheduling is being addressed.
INSP-Final Inspection4/5/20104/5/20104/5/2010PFAIL
DetailsTroy Cobbley
The AES panel had a Netcon 5. The AES panel was being used as a stand alone facp which is not allowed due to listing. The city approved drawings showed a separate facp connected to the new AES panel. No testing other than the Netcon was performed.
INSP-Final Inspection4/2/20104/5/20104/5/2010AFAIL
DetailsTroy Cobbley
I spoke to Bryan at 7:43 to meet with him first thing. I waited at the project site until 8:15. There was no answer on his phone when I tried to re-contact him. No inspection was performed.
FIR-Aging Inspection5/27/20095/27/20095/27/2009 NR
DetailsTroy Cobbley
work is in progress
Issue and Print Permit  2/25/2009 DONE
Plan assigned to (Stephanie)2/4/2009 2/17/2009 DONE
DetailsStephanie L. Cobbley
Alarm Plan Check2/17/2009 2/17/2009 PASS
DetailsStephanie L. Cobbley
see review comments
PLANS/APPL TAKEN TO FRONT DESK  2/17/2009 DONE
approved plans available at front counter
Inspection Record Card- Fire2/17/2009 2/17/2009 DONE
Details
Telephone call  2/17/2009 DONE
Details
t/c w lori at ###-#### - permit ready and fees due
Permit Ready to Issue  2/17/2009 DONE
Details
Application received  2/4/2009