INSP-Final Inspection | 5/4/2009 | 5/7/2009 | 5/8/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final site inspection.
|
INSP-Sprinkler Rough-in | 4/22/2009 | 4/23/2009 | 4/23/2009 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler system modifications per the scope of permit work are okay for cover at the drop ceilings, minor changes in field installation affecting final head location approved.
|
Issue and Print Permit | | | 2/23/2009 | | DONE |
Barbara Stitt
|
|
|
|
Sprinkler Plan Check | 2/20/2009 | | 2/20/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/20/2009 | | 2/20/2009 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2009 | | DONE |
|
|
|
left vm for brodie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/20/2009 | | DONE |
|
|
|
|
Application received | | | 2/18/2009 | | |
|
|
|
|
Pending Assignment by SAM | 2/18/2009 | | | | |
|
|
|
|