Pending Assignment by SAM | 2/20/2009 | | 4/16/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
4/16/2009 12:18:22 ALR - activity updated through activity FIRA158 from case FIR09-00245.
|
Telephone call | | | 4/15/2009 | | DONE |
Tim Frost
|
|
|
Spoke with Brad at SimplexGrinnell in regards to the two new accordian doors. Since we have adequate protection on each side of the doors to cover the entire area, I did not see any problem with the potential for the new sprinklers inbetween the doors possible causing a cold soldering affect. The only time the new sprinklers in between the doors are required are when the doors are closed. When the doors are closed there will be no cold soldering affect.
|
INSP-Final Inspection | 4/1/2009 | 4/2/2009 | 4/2/2009 | P | PASS |
Forrest France
|
|
|
Items on issued correction notice verified for completion, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 3/16/2009 | 3/17/2009 | 3/17/2009 | P | PART |
Forrest France
|
|
|
See plan annotations for locations of repairs to be made including two upright heads obstructed by adjacent ductwork, deficient existing seismic bracing at the 3" main within the scope of remodel area, dry pendent at the new cooler has not yet been installed. Remainder of overhead modifications okayed.
|
Sprinkler Plan Check | 2/24/2009 | | 2/24/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/24/2009 | | 2/24/2009 | | DONE |
|
|
|
|
Telephone call | | | 2/24/2009 | | DONE |
|
|
|
t/c w brad at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/24/2009 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/24/2009 | | DONE |
|
|
|
|
Application received | | | 2/20/2009 | | |
|
|
|
|
Case Summary | | | 2/20/2009 | | DONE |
|
|
|
|