Miscellaneous action | | | 5/11/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 4/1/2009 | 4/1/2009 | 4/1/2009 | P | PASS |
Forrest France
|
|
|
Scope of fire alarm work passed field testing, permit finaled.
|
INSP-Alarm Testing | 3/31/2009 | 4/1/2009 | 4/1/2009 | A | CANC |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 3/31/2009 at 11:31:58 AM. Contact: ###-####.
|
Plan assigned to (Stephanie) | 2/23/2009 | | 3/4/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 3/4/2009 | | DONE |
|
|
|
Spoke with Robert King regarding the hood suppression system. He gave me the go-ahead to include the hood suppression system connections for the fire alarm in his scope of work under this permit.
|
Alarm Plan Check | 3/4/2009 | | 3/4/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
see redlines and review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2009 | | DONE |
|
|
|
Approved redlined plans available at front counter
|
Inspection Record Card- Fire | 3/4/2009 | | 3/4/2009 | | DONE |
|
|
|
|
Telephone call | | | 3/4/2009 | | DONE |
|
|
|
t/c w robert king at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/4/2009 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/4/2009 | | DONE |
|
|
|
|
Telephone call | | | 3/3/2009 | | DONE |
|
|
|
Left a message for Mike Heath at General Fire that there is a new commercial hood fire extinguisting system being installed (FIR09-00118) that is attached to the same building permit as the fire alarm T.I. I stated that I need to know if it should be included under his permit scope, or if it will be submitted separately under a different fire permit number. I also let him know that the tenant could not get signed off until the hood system connections are addressed.
|
Application received | | | 2/23/2009 | | |
|
|
|
|