INSP-Final Inspection | 6/29/2009 | 6/29/2009 | 6/29/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit Finaled
|
INSP-Supply line flush | 5/4/2009 | 5/5/2009 | 5/5/2009 | A | PASS |
Troy Cobbley
|
|
|
The underground flush passed.
|
Pending Assignment by SAM | 3/6/2009 | | 4/9/2009 | | DONE |
Barbara Stitt
|
|
|
4/9/2009 10:56:54 B_S - activity updated through activity FIRA158 from case FIR09-00239.
|
INSP-Sprinkler Rough-in/Hydro | 3/23/2009 | 3/23/2009 | 3/23/2009 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro passed.
|
INSP-Sprinkler Rough-in/Hydro | 3/19/2009 | 3/20/2009 | 3/20/2009 | A | FAIL |
Forrest France
|
|
|
UG supply line hydrostatic test failed due to pressure loss at the guage per inspection by T. Frost.
|
INSP-Sprinkler Rough-in | 3/11/2009 | 3/12/2009 | 3/12/2009 | P | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok to cover.
|
Sprinkler Plan Check | 3/9/2009 | | 3/9/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2009 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 3/9/2009 | | DONE |
|
|
|
left message w antionette for tyson smith at ###-#### - permit ready and fees given
|
Inspection Record Card- Fire | 3/9/2009 | | 3/9/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/9/2009 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/9/2009 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 3/6/2009 | | |
|
|
|
|