INSP-Final Inspection | 5/27/2009 | 5/28/2009 | 5/28/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Supply line flush | 4/22/2009 | 4/23/2009 | 4/23/2009 | A | PASS |
Troy Cobbley
|
|
|
the underground supply flush passed
|
INSP-Sprinkler Rough-in/Hydro | 3/20/2009 | 3/23/2009 | 3/23/2009 | A | CANC |
Troy Cobbley
|
|
|
The wrong inspection number was called in.
|
INSP-Sprinkler Rough-in/Hydro | 3/19/2009 | 3/20/2009 | 3/20/2009 | A | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed per T. Frost.
|
Pending Assignment by SAM | 3/6/2009 | | 3/18/2009 | | DONE |
Tim Frost
|
|
|
3/18/2009 15:40:17 TRF - activity updated through activity FIRA158 from case FIR09-00179.
|
INSP-Sprinkler Rough-in/Hydro | 3/11/2009 | 3/12/2009 | 3/12/2009 | P | PASS |
Troy Cobbley
|
|
|
The underground supply piping is ok to cover.
|
Issue and Print Permit | | | 3/9/2009 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 3/6/2009 | | |
|
|
|
|
Sprinkler Plan Check | 3/6/2009 | | 3/6/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/6/2009 | | 3/6/2009 | | DONE |
|
|
|
|
Telephone call | | | 3/6/2009 | | DONE |
|
|
|
left message w darcy for tyson smith at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/6/2009 | | DONE |
|
|
|
|