Permit Information
Permit NumberFIR09-00164
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 1105 N 13TH ST
Project NameNORTH JUNIOR HIGH SCHOOL
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of two new sprinkler systems to an existing building. There will be one wet system that protects the first floor. There will be one dry system that protects the second floor and attic. The dry system will utilize galvanized piping. There is a limited existing fire protection that will be reused in various locations. Flexible sprinkler drops will be employed on this project.

North Junior High School - Gymnasium Addition & Remodel - To demo all interior partitions and finishes west of grid line "J" at the basement and 1st floor gym. To remove northeast stairway east of grid line "J" and demo and remove west exterior wall. To construct a new 3,755 sq. ft. addition at the west end of the basement & refinish entire basement to include new elevator, interior ramps, locker rooms, equip. storage, mech. room., class room, weight room, wrestling room and new egress hallways and new west stair enclosure. to construct an new 3,880 sq. ft. first floor addition on the west end of the existing gym to enlarge gym to 10,590 sq. ft. and a new entry vestibule, new restrooms & stair enclosure at west end of gym. There will be a divider wall at the center of the gym to divide the gym into two areas. To also construct a new 825 sq. ft. mechanical mezzanine at the new addition. An elevator is being installed to provide an accessible route to the basement and second floor. The scope of work for this project will also include a sprinkler upgrade. All construction per the approved plans and attached comment list. CUP08-00062 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/1/200910/2/200910/2/2009APASS
DetailsForrest France
Final walkthrough, noted correction items, and trip testing for the two new dry systems completed satisfactory. Fire sprinkler permit okayed for final.
INSP-Final Inspection9/30/200910/1/200910/1/2009ADEFR
DetailsForrest France
Scheduled by a contractor via Hello! on 9/30/2009 at 10:55:01 AM. Contact: ###-####.
INSP-Final Inspection9/28/20099/28/20099/28/2009PPART
DetailsForrest France
INSP-Final Inspection9/23/20099/24/20099/24/2009PNR
DetailsForrest France
INSP-Alarm Testing8/27/20098/28/20098/28/2009APART
DetailsForrest France
Pneumatic testing for the new dry system concluded per inspection by T. Frost.
INSP-Alarm Testing8/27/20098/27/20098/28/2009PPART
DetailsForrest France
Fire alarm testing is not ready at this time, contractor requested inspection type be changed to begin 24 hr. air test of the new dry sprinkler system- Test started at 3:00pm @ 43psig 8/27/09 by T. Frost.
INSP-Sprinkler Rough-in/Hydro8/26/20098/27/20098/27/2009APART
DetailsForrest France
Hydrostatic testing completed satisfactory for the new attic and second floor dry system.
INSP-Sprinkler Rough-in/Hydro8/25/20098/26/20098/26/2009PCANC
DetailsTroy Cobbley
Cancelled due to time constraints. No inspection was performed.
INSP-Sprinkler Rough-in/Hydro8/25/20098/25/20098/25/2009PPASS
DetailsTroy Cobbley
The sprinkler piping in the interstitial space and the attic area passed inspection. Steve and I noted several chase doors that will need to be removed/permanantly closed that are obstructing attic sprinklers. Several shipping caps had been left on the uprights and steve will go through the system and re-verify that all have been removed. Viking was in the process of lenghtening several sprig ups and providing additional hangers at arm-overs in the interstitial space.
INSP-Sprinkler Rough-in/Hydro8/19/20098/20/20098/21/2009APART
DetailsForrest France
Overhead hydrostatic test for the new dry system above the band room passed, noted air compressor serving this system to be hard wired, upright at the valve room is obstructed.
INSP-Sprinkler Rough-in/Hydro8/14/20098/17/20098/18/2009APART
DetailsForrest France
Overhead work sheet FP 5 north half classroom wing inspected today including the dry system above the band room. See notations on plan for correction items at classroom 214 for a branch line to be regraded, two obstructed pendent heads at classroom 211, noted choir room 219 inspectors test has been relocated-field mod. okayed, main tie-ins at 5 locations in the corridor are not finished, missing coverage at the new dry valve riser enclosure in the band room-sheet FP3. Attic area not yet inspected.
INSP-Sprinkler Rough-in/Hydro8/11/20098/12/20098/12/2009APART
DetailsForrest France
Inspection for the second floor classrooms sheet FP4 completed today excluding the corridor not yet finished. Noted items include missing flexible couplings at four locations, one open outlet at the library room for attic protection, missing return bend per detail #7 on plans at four pendent heads, main and branch line pitch for dry systems to be maintained per NFPA, annotated field changes at two rooms for sw heads installed in lieu of pendent heads as shown on plans.
INSP-Sprinkler Rough-in/Hydro8/10/20098/10/20098/10/2009PPART
DetailsForrest France
Rough-in for overhead work at the new gym and stage areas per red-lines on plan set okayed with the exception of two overspaced locations below duct shafts at the stage stair landings, chair/table storage below the stage must be non-combustible or provide sprinkler protection, noted minor changes at branchline feeds for tailbacks at the east side of the gym. Hydrostatic testing for the gym system passed.
INSP-Conference7/29/20097/29/20097/29/2009PDONE
DetailsForrest France
On site meeting with CM company, United Water, and Boise School district regarding backflow prevention device locations at the main fire riser.
CHANGE STATUS TO (ISS)  7/29/2009 DONE
(F) Reprint permit  7/29/2009 DONE
Plan assigned to (Tim)7/27/2009 7/28/2009 DONE
DetailsTim Frost
7/28/2009 13:36:42 TRF - activity updated through activity FIRA22 from case FIR09-00164.
Sprinkler Plan Check7/28/2009 7/28/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  7/28/2009 DONE
DetailsTim Frost
Telephone call  7/28/2009 DONE
Details
t/c w tom easton at ###-#### - permit ready (plan mod) and fees given
Permit Ready to Issue  7/28/2009 DONE
Details
Plan resubmittals received  7/27/2009  
DetailsTim Frost
Received application and three copies of submittals documents and plan sheets 1, 2, 3, 4, 5, 6, 7; taken to fire review
Pending Assignment by SAM3/10/2009 7/27/2009 DONE
DetailsTisha Gallop
7/27/2009 14:55:05 LEG - activity updated through activity FIRA158 from case FIR09-00164.
INSP-Sprinkler Rough-in/Hydro7/21/20097/22/20097/22/2009APART
DetailsForrest France
Overhead rough-in for the first floor classroom wing sheet FP-2 okayed as red lined with today's date. Sizing changes at the main to match with approved plan set.
INSP-Sprinkler Rough-in/Hydro7/10/20097/10/20097/10/2009PPART
DetailsForrest France
Okay to cover ceilings at the north classroom wing per notations on plan, also inspected rough-in above the folding partition wall at the new gym.
INSP-Sprinkler Rough-in/Hydro7/8/20097/9/20097/10/2009APART
DetailsForrest France
See red-line annotations on plan set for classroom wing first floor north side inspected today. Noted two overspaced heads at the office area, rough-in at one classroom does not match approved design, bandroom is incomplete as upright protection above the ceiling remains to be added. Hydrostatic test for the 1st floor classroom wet system passed.
INSP-Sprinkler Rough-in/Hydro6/17/20096/17/20096/18/2009PPART
DetailsForrest France
Basement area rough-in okayed per red-line annotations.
INSP-Sprinkler Rough-in/Hydro5/21/20095/22/20095/22/2009APART
DetailsForrest France
See stamped plan set for overhead rough-in inspected to date.
INSP-Sprinkler Rough-in/Hydro5/19/20095/20/20095/21/2009APART
DetailsForrest France
Overhead hydrostatic testing for the new system piping at the basement level as annotated on plan sheet FP1 completed satisfactory. OH rough-in also done for this area in conjunction with the hydrostatic test-noted blocked uprights at a storage room, final head locations may need adjusted as ceilings and lights are installed.
Inspection Record Card- Fire4/24/2009 4/24/2009 DONE
Details
Telephone call  4/24/2009 DONE
Details
t/c w tom easton at ###-#### - permit ready and fees given
Permit Ready to Issue  4/24/2009 DONE
Details
Issue and Print Permit  4/24/2009 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/23/2009 DONE
DetailsTim Frost
Sprinkler Plan Check4/23/2009 4/23/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Plan resubmittals received  4/14/2009  
DetailsTisha Gallop
Received application and four copies of submittal info and plan sheets 1, 2, 3, 4, 5, 6, 7; taken to fire review
Miscellaneous action  3/16/2009 DONE
DetailsTisha Gallop
customer picked up failed plans
Sprinkler Plan Check3/13/2009 3/13/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Miscellaneous action  3/13/2009 DONE
Emailed comments to Viking
Telephone call  3/13/2009 DONE
Details
left message w carrie for tom easton at ###-#### - permit was rejected and needs to be picked up and resubmitted
Case Summary  3/10/2009 DONE
DetailsBarbara Stitt
Application received  3/10/2009