Permit Information
Permit NumberFIR09-00177
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 6776 W VICTORY RD
Project NameHORTON FLUID POWER
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of 15' of 6" C-900 underground ONLY.

Horton Fluid Power - To construct a new 11,525 square foot, one story with 760 square foot mezzanine, pre-engineered steel building and related site improvements. This building is for a 9,075 square foot Maintenance and Repair shop and a 2,450office first floor office with 760 square foot mezzanine office and storage area. This building is fully fire sprinkled. The sprinklers are used for area increase. All construction to be per the approved plans and the attached comment list. DRH08-00159 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/2/20097/2/20097/2/2009PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro5/5/20095/6/20095/5/2009ACANC
DetailsTroy Cobbley
Rob Claborn Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
INSP-Sprinkler Rough-in/Hydro4/21/20094/22/20094/22/2009PPASS
DetailsTroy Cobbley
The underground hydro test passed.
INSP-Sprinkler Rough-in/Hydro4/21/20094/22/20094/22/2009APASS
DetailsTroy Cobbley
The underground flush passed.
INSP-Sprinkler Rough-in/Hydro4/21/20094/21/20094/21/2009ACANC
DetailsTroy Cobbley
The hydro test is being cancelled due to the locked united water valve
INSP-Supply line flush4/20/20094/21/20094/21/2009AFAIL
DetailsTroy Cobbley
The United Water valve lock was still in place so the flush could not be completed.
INSP-Sprinkler Rough-in/Hydro4/20/20094/21/20094/21/2009PCANC
DetailsTroy Cobbley
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
INSP-Sprinkler Rough-in/Hydro4/10/20094/13/20094/13/2009APASS
DetailsTroy Cobbley
The underground piping is ok for cover.
INSP-Sprinkler Rough-in/Hydro4/9/20094/10/20094/10/2009AFAIL
DetailsTroy Cobbley
The city approved plans were not at the job site so no inspection was performed.
Issue and Print Permit  4/9/2009 DONE
Plan assigned to (Tim)3/27/2009 4/7/2009 DONE
DetailsTim Frost
4/7/2009 15:59:11 TRF - activity updated through activity FIRA22 from case FIR09-00177.
Pending Assignment by SAM3/18/2009 4/7/2009 DONE
DetailsTim Frost
3/27/2009 08:34:02 SJA - activity updated through activity FIRA158 from case FIR09-00177.
Plan resubmittals received  4/7/2009  
DetailsTisha Gallop
Received application and three copies of sheet FP-1; taken to fire review
Sprinkler Plan Check4/7/2009 4/7/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  4/7/2009 DONE
DetailsTim Frost
Meeting  4/7/2009 DONE
Emailed Review
Inspection Record Card- Fire4/7/2009 4/7/2009 DONE
Details
Telephone call  4/7/2009 DONE
Details
t/c w brook at ###-#### - permit (underground only) ready and fees given
Permit Ready to Issue  4/7/2009 DONE
Details
Plan assigned to (Tim)3/18/2009 4/1/2009 DONE
DetailsTim Frost
Telephone call  4/1/2009 DONE
Details
t/c w john at ###-#### - permit denied - needs to be picked up and resubmitted
Sprinkler Plan Check4/1/2009 4/1/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Application DENIED  3/19/2009 DONE
DetailsTim Frost
Please see attacehd comments. Application exceeds the limited criteria of a quick permit.
Telephone call  3/19/2009 DONE
Details
left message w kim for brook nelson at ###-#### - permit was denied - needs to be picked up and resubmitted
Application received  3/18/2009