INSP-Final Inspection | 7/14/2009 | 7/15/2009 | 7/15/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Fire alarm interconnection complete and tested by Forrest France
|
INSP-Alarm Testing | 6/22/2009 | 6/23/2009 | 6/23/2009 | A | NR |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 6/22/2009 at 8:24:58 PM. Contact: ###-####. Pending project related fire alarm permit work.
|
INSP-Conference | 6/22/2009 | 6/23/2009 | 6/23/2009 | A | DONE |
Forrest France
|
|
|
Regarding items needed for completion and permit final.
|
INSP-Sprinkler Rough-in/Hydro | 5/11/2009 | 5/11/2009 | 5/11/2009 | A | PART |
Forrest France
|
|
|
Pendent heads at the 1st floor elevator lobby are okay for ceiling cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/15/2009 | 4/15/2009 | 4/15/2009 | A | PART |
Forrest France
|
|
|
Overhead system hydrostatic testing passed.
|
Application received | | | 4/9/2009 | | |
|
|
|
|
Issue and Print Permit | | | 4/9/2009 | | DONE |
Barbara Stitt
|
|
|
|