Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberFIR09-00247
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 6776 W VICTORY RD
Project NameHORTON FLUID POWER
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of 15' of 6" C-900 underground. There is one new wet pipe system and one new antifreeze system protecting one new building. The building is one floor with a mezzanine. The sprinklers are extended coverage. Since the building contains combustible liquids it is design for Extra Hazard Group 1. There are ancillary areas of light hazard for the offices and ordinary hazard 2 for the wash bay.

Horton Fluid Power - To construct a new 11,525 square foot, one story with 760 square foot mezzanine, pre-engineered steel building and related site improvements. This building is for a 9,075 square foot Maintenance and Repair shop and a 2,450office first floor office with 760 square foot mezzanine office and storage area. This building is fully fire sprinkled. The sprinklers are used for area increase. All construction to be per the approved plans and the attached comment list. DRH08-00159 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/29/20096/30/20096/30/2009APASS
DetailsTroy Cobbley
Permit finaled. The forward flush passed.
INSP-Final Inspection6/29/20096/29/20096/29/2009PFAIL
DetailsTroy Cobbley
Sprinkler piping in the wash bay has been modified to match original approved plan. Forward flush failed.
INSP-Final Inspection6/23/20096/23/20096/23/2009PFAIL
DetailsTroy Cobbley
The plans do not reflect the additional sprinklers heads in the compressor room that have been added to the the anti-freeze system. Per my discussion with Tim Frost these changes need to be resubmitted due to the adjacent remote hydraulic area being effected by a non self closing door. Also two 45 fittings have been added at the base of the riser which are not shown on the plans. The backflow preventor needs to be certified and the forward flush performed.
Inspection Record Card- Fire6/23/2009 6/23/2009 DONE
Details
Telephone call  6/23/2009 DONE
Details
left message with thelma for brook at ###-#### - permit (plan mod) ready and fees given
Permit Ready to Issue  6/23/2009 DONE
Details
CHANGE STATUS TO (ISS)  6/23/2009 DONE
DetailsAlexandra L. DeYoung
(F) Reprint permit  6/23/2009 DONE
DetailsAlexandra L. DeYoung
Plan assigned to (Tim)6/19/2009 6/22/2009 DONE
DetailsTim Frost
6/22/2009 16:35:57 TRF - activity updated through activity FIRA22 from case FIR09-00247.
Sprinkler Plan Check6/22/2009 6/22/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  6/22/2009 DONE
DetailsTim Frost
Plan resubmittals received  6/19/2009  
DetailsTisha Gallop
Received three copies of application, United Water Flow sheet, Hydraulic Calcs, submittal info packet and plan sheets FP-1, FP-2; taken to Fire Review
INSP-Sprinkler Rough-in/Hydro6/15/20096/15/20096/16/2009PPASS
DetailsTroy Cobbley
The overhead hydro test passed. The FDC piping was not included in the hydro test and will need to be done.
INSP-Sprinkler Rough-in/Hydro6/9/20096/10/20096/10/2009PPART
DetailsTroy Cobbley
Todays inspection was a rough-in. See the city approved plans for the corrections required which include an overspaced head, a pendant that needs to be supplied from its own mechanical tee, additional hangers on the 2" anti-freeze supply piping and resubmittals showing the anti-freeze system in the front entry canopy and the modifications at the wash bay.
Telephone call  6/8/2009 DONE
Spoke with Terry at Commerical Fire. He said that there would be (1) combustible beam in the outside canopy. I told him sprinklers would not be required due to the extremely limited amount of combustibles.
INSP-Sprinkler Rough-in/Hydro5/5/20095/6/20095/7/2009PPART
DetailsTroy Cobbley
The sprinkler piping above the office/lobby/storage areas are ok to cover
INSP-Sprinkler Rough-in5/4/20095/4/20095/4/2009PPART
DetailsTroy Cobbley
The rough-in inspection for the piping below the mezzanine passed. An additional inspection will be required when the ceilings and light fixtures have been installed.
Issue and Print Permit  5/4/2009 DONE
Plan assigned to (Tim)4/28/2009 5/1/2009 DONE
DetailsTim Frost
5/1/2009 15:05:44 TRF - activity updated through activity FIRA22 from case FIR09-00247.
Sprinkler Plan Check5/1/2009 5/1/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  5/1/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire5/1/2009 5/1/2009 DONE
Details
Telephone call  5/1/2009 DONE
Details
left message with leah for brook at ###-#### - permit ready and fees given
Permit Ready to Issue  5/1/2009 DONE
Details
Plan resubmittals received  4/28/2009  
DetailsTim Frost
Miscellaneous action  4/23/2009 DONE
DetailsTisha Gallop
picked up rejected plans
Telephone call  4/22/2009 DONE
Details
t/c w brook at ###-#### - permit rejected - needs to be picked up and resubmitted
Plan assigned to (Tim)4/16/2009 4/21/2009 DONE
DetailsTim Frost
Resubmittal
Sprinkler Plan Check4/21/2009 4/21/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Miscellaneous action  4/21/2009 DONE
Emailed comments to Brook
Application received  4/16/2009  
Pending Assignment by SAM4/16/2009 4/16/2009 DONE
DetailsTisha Gallop
4/16/2009 14:35:26 LEG - activity updated through activity FIRA158 from case FIR09-00247.