Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR09-00260
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 2390 E FREIGHT ST
Project NameWinco Distribution Center
Customer Number 
ePlanReview 
Description
(Maintenance Bldg.) The Fire Sprinkler Scope of work consists of a new fire protection system for a new building. The building has a mixed occupancy. The fire protection system is designed for ordinary hazard group 2.

Dispatch and Maintenance Building - To construct a new 12,395 square foot, one story with 960 square foot storage mezzanine, pre-engineered metal office and maintenance building and related site improvements. This building contains an 8,265 square foot vehicle repair bay and storage areas and a 4,130 square foot dispatch office area. All construction per the approved plans and attached comment list. DRH07-00594 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  1/5/2010 DONE
DetailsTim Frost
Plans taken to scanning.
INSP-Final Inspection11/18/200911/18/200911/18/2009PPASS
DetailsForrest France
Fire sprinkler permit okayed for final status, corrections completed.
INSP-Final Inspection9/15/20099/16/20099/17/2009APART
DetailsForrest France
TOC approved.
INSP-Sprinkler Rough-in/Hydro9/8/20099/8/20099/8/2009PPART
DetailsForrest France
Overhead hydrostatic testing passed, final pending project related fire alarm permit work, main drain valve does not need to be electricaly supervised, need "911" sign at the outside bell.
INSP-Sprinkler Rough-in/Hydro9/4/20099/4/20099/8/2009PPART
DetailsForrest France
John Phone #: ###-####
INSP-Sprinkler Rough-in8/26/20098/26/20098/28/2009PPART
DetailsForrest France
See inspection comments per site visit by T. Frost dated 8/26-Missing SW sprinklers below the garage doors if they are going to be roll back doors.
Riser is not stacked.
Roof top heater is blocking sprinkler discharge.
Ceiling areas are OK to cover.
INSP-Sprinkler Rough-in7/29/20097/29/20097/29/2009PPART
DetailsForrest France
Okay to cover hard lid ceilings at the mens and womens restrooms per red lines and initials on stamped plan set.
Plan assigned to (Tim)4/30/2009 5/5/2009 DONE
DetailsTim Frost
5/5/2009 13:52:35 TRF - activity updated through activity FIRA22 from case FIR09-00260.
Sprinkler Plan Check5/5/2009 5/5/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  5/5/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire5/5/2009 5/5/2009 DONE
Details
Telephone call  5/5/2009 DONE
Details
t/c w chris at ###-#### - permit ready and fees given
Permit Ready to Issue  5/5/2009 DONE
Details
Issue and Print Permit  5/5/2009 DONE
Plan resubmittals received  4/30/2009  
DetailsTim Frost
Plan assigned to (Tim)4/30/2009 4/30/2009 DONE
DetailsTim Frost
Plan assigned to (Tim)4/21/2009 4/29/2009 DONE
DetailsTim Frost
New 05-05-09
Sprinkler Plan Check4/29/2009 4/29/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Telephone call  4/29/2009 DONE
Details
t/c w chris at ###-#### - permit denied - needs to be picked up and resubmitted
Permit Ready to Issue  4/29/2009 DONE
Details
Application received  4/21/2009  
Case Summary  4/21/2009 DONE