Miscellaneous action | | | 7/28/2010 | | DONE |
|
|
|
FA plans taken to records for scanning.
|
INSP-Final Inspection | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The panel was replaced with the model that was submitted on. The Netcon was a 5.
|
INSP-Final Inspection | 7/8/2010 | 7/8/2010 | 7/8/2010 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for tomorrow due to micron plan review today.
|
INSP-Final Inspection | 7/1/2010 | 7/2/2010 | 7/2/2010 | P | CANC |
Troy Cobbley
|
|
|
Give Randy a call ###-####. Inspection requested from web by: Mike Brown Phone #: ###-#### Inspection cancelled from web by: Mike Brown
|
INSP-Final Inspection | 6/30/2010 | 6/30/2010 | 6/30/2010 | P | FAIL |
Troy Cobbley
|
|
|
The model of Aes installed does not match what was submitted. Also an intella tap has been installed which is not shown on the plans. I told Randy that this once I would accept this as an as-built but all other would need to resubmitted as previously discussed on the last inspection.
|
Telephone call | | | 6/14/2010 | | DONE |
|
|
|
Spoke to Tom with Allied General. He stated he would get an inspection for this called in right away.
|
FIR-Aging Inspection | 9/7/2009 | 9/7/2009 | 9/10/2009 | | NR |
Troy Cobbley
|
|
|
work is in progress per david
|
Issue and Print Permit | | | 5/20/2009 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 4/28/2009 | | 5/6/2009 | | DONE |
Stephanie L. Cobbley
|
|
|
5/6/2009 09:10:54 SLC - activity updated through activity FIRA24 from case FIR09-00277.
|
Alarm Plan Check | 5/6/2009 | | 5/6/2009 | | PASS |
Stephanie L. Cobbley
|
|
|
See review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 5/6/2009 | | DONE |
|
|
|
Approved plans available at front counter
|
Inspection Record Card- Fire | 5/6/2009 | | 5/6/2009 | | DONE |
|
|
|
|
Telephone call | | | 5/6/2009 | | DONE |
|
|
|
left message w joe for ken webster at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/6/2009 | | DONE |
|
|
|
|
Application received | | | 4/28/2009 | | |
|
|
|
|