INSP-Final Inspection | 5/7/2009 | 5/7/2009 | 5/11/2009 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Conference | 5/6/2009 | 5/6/2009 | 5/6/2009 | A | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work okayed for final, missing fire stop installed while on site.
|
INSP-Sprinkler Rough-in/Hydro | 5/5/2009 | 5/5/2009 | 5/5/2009 | A | NH |
Forrest France
|
|
|
No access to the elevator machine room or elevator pit, on site discussion with contractor regarding project final.
|
Issue and Print Permit | | | 5/4/2009 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 4/29/2009 | | 5/1/2009 | | DONE |
Scott Arellano
|
|
|
5/1/2009 14:27:57 SJA - activity updated through activity FIRA22 from case FIR09-00278.
|
Sprinkler Plan Check | 5/1/2009 | | 5/1/2009 | | PASS |
Scott Arellano
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2009 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/1/2009 | | 5/1/2009 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2009 | | DONE |
|
|
|
left vm for brook at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/1/2009 | | DONE |
|
|
|
|
Application received | | | 4/29/2009 | | |
|
|
|
|