Permit Information
Permit NumberFIR09-00281
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 10139 W OVERLAND RD
Project NameSpring Creek Asst Living
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of approximately 85' of 6" C-900 PVC underground piping ONLY. A separate permit will follow at a later date for the overhead system.

Spring Creek Overland - Senior Assisted-Living - Building D - Project consists of construction and finish of a 26,506 sq. ft., 42 sleeping unit, 50 beds, Senior Assisted Living Development with support facilities and associated site work, all per reviewed plans. To construct 18 one bedroom @ 552 sq. ft.; 12 Large Studio units @ 384 sq. ft.; 6 Small Studio Units @ 300 sq. ft.; and 6 Private HC units @ 227 sq. ft., six fully accessible units and 36 Type 'B' accessible units. drs DRH08-00246 CUP08-00010
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/8/2010 DONE
Plans sent to scanning.
INSP-Final Inspection2/22/20102/22/20102/22/2010PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush11/11/200911/13/200911/13/2009APASS
DetailsTroy Cobbley
The underground flush passed.
INSP-Sprinkler Rough-in/Hydro8/17/20098/18/20098/19/2009APASS
DetailsTroy Cobbley
The underground sprinkler hydro inspecection passed
Override - Parcel Holds  8/17/2009  
Override - Parcel Holds  8/17/2009  
Override - Parcel Holds  8/17/2009  
Override - Parcel Holds  8/17/2009  
INSP-Sprinkler Rough-in7/23/20097/23/20097/23/2009PPART
DetailsForrest France
Underground fire supply line okayed for cover.
INSP-Sprinkler Rough-in7/20/20097/21/20097/21/2009AFAIL
DetailsTroy Cobbley
There were no approved plans on site for the inspection. No inspection was performed and the supply piping can not be covered.
Telephone call  7/8/2009 DONE
DetailsTim Frost
Spoke with Bryan Johnson. He advised me he was required to change a 22.5 and 11 ells in the underground to a 45 degree ell. This is a deviation from the plans that were submitted. He is going to update the underground drawing when he submits the overhead drawings. The over head drawing are suppose to be submitted shortly. He will also use the 45 ell in the hydraulic calcaulations. I spoke with Troy Cobbley and advised him of this change and the plan of action.
INSP-Sprinkler Rough-in7/7/20097/7/20097/7/2009PCANC
DetailsTroy Cobbley
This is an underground to cover. Jared is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
Plan assigned to (Tim)5/1/2009 5/5/2009 DONE
DetailsTim Frost
5/5/2009 11:07:29 TRF - activity updated through activity FIRA22 from case FIR09-00281.
Sprinkler Plan Check5/5/2009 5/5/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.

Udg Only.
PLANS/APPL TAKEN TO FRONT DESK  5/5/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire5/5/2009 5/5/2009 DONE
Details
Telephone call  5/5/2009 DONE
Details
t/c w bryan at ###-#### - permit ready and fees given
Permit Ready to Issue  5/5/2009 DONE
Details
Issue and Print Permit  5/5/2009 DONE
Application received  5/1/2009  
Case Summary  5/1/2009 DONE