The Fire Sprinkler Scope of work consists of revising two existing sprinkler system in one existing building. A new addition will be added to the west side of the building. Two new air handler platforms are being added. The building will have high pile class III commodity storage in various areas. The existing fire protection systems divisions are being changed. Extra large orifice sprinklers are being utilized in some areas. Several new cross mains are being added to increase the fire protection systems flow capabilities. A new backflow preventer will be added to the existing riser assembly. The intention is to have fire protection throughout the building.

Plan Modification Scope:
The plans have been reviewed for the green ballooned areas only. All other areas are to conform to original approved submittal. There were miscellaneous modifications due to field conditions. The hydraulics were revised to reflect additional fittings.

Winco Foods - Store #6 - Addition, Remodel and New Front Entrance Canopy- To demolish the west and a portion of the north exterior walls and construct a 14,700 square foot retail store addition on the west end of the building and a 1,410 square foot storage and receiving hallway addition on the northwest side of the building. To construct a new truck dock on the northwest side of the building and to construct new facade and entry canopy at the front of the building. The entire building will be remodeled and updated in phases. The remodel will include finishing the west addition, constructing a new 1,235 sq. ft. mechanical platform above a portion of the grocery storage area, to construct new dairy cooler and grocery freezer, construct new ice cream cases, demo and construct new bakery department, update public restrooms, demo and install new refrigeration cases and refrigerant piping, construct new coolers and freezers for the deli and meat departments, construct new main entry and exit areas, demo and construct new security and customer service areas and to relocate and install new check stands and display shelving. New skylights will also be installed on the roof. This building was reviewed as an unlimited area building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  1/5/2010 DONE
DetailsTim Frost
Plans taken to scanning.
INSP-Final Inspection12/14/200912/15/200912/15/2009APASS
DetailsTroy Cobbley
Permit finaled. Forward flush passed.
INSP-Sprinkler Rough-in/Hydro11/5/200911/6/200911/6/2009APART
DetailsTroy Cobbley
The hydro test for the anti-freeze system passed. Most of the deficiencies from the previous correct notice have been addressed. I deferred the contractor to Tim Frost on wether resubmittals will be again required due to these as-builts not matching what is actually installed. This includes main locations and pipe routing which could affect the hydraulic calculations. Also there are still painted/covered heads over the sales floor. The unsprinklered attic has been painted white with some sort of chemical but no information was provided for fire retardant verification. Not all of the wood had been painted either.
INSP-Sprinkler Rough-in/Hydro11/4/200911/5/200911/5/2009APASS
DetailsTroy Cobbley
The overhead hydro test of both wet systems passed.
Plan assigned to (Tim)11/4/2009 11/5/2009 DONE
DetailsTim Frost
11/5/2009 11:48:17 TRF - activity updated through activity FIRA22 from case FIR09-00291.
Sprinkler Plan Check11/5/2009 11/5/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  11/5/2009 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/5/2009 DONE
DetailsTim Frost
Telephone call  11/5/2009 DONE
Details
left vm for shaun at ###-#### - permit (plan mod) ready and fees given
Permit Ready to Issue  11/5/2009 DONE
Details
CHANGE STATUS TO (ISS)  11/5/2009 DONE
(F) Reprint permit  11/5/2009 DONE
Plan resubmittals received  11/4/2009  
DetailsTisha Gallop
Plan Modification: Received application and three copies of submittal documents and plan sheets FP1, FP2, FP3; taken to fire review
INSP-Sprinkler Rough-in10/22/200910/23/200910/23/2009APART
DetailsTroy Cobbley
Todays inspection was for the coolers and freezers. See the city approved plans for coolers and freezers where piping and pendants where ok. The dairy cooler has fan units causing obstructions to the pendant sprinklers. One arm over requires a hanger above the meat cooler.
INSP-Sprinkler Rough-in10/14/200910/15/200910/15/2009APART
DetailsTroy Cobbley
Todays inspection was for the majority of the project. I could only pass acouple of small areas where the piping could be covered. These areas have been marked on the city approved plans. All other areas have been installed differently from the approved plans. This includes additional fittings at the bottom of the riser, in feed mains, in riser nipples and branchlines. Sprinkler heads are overspaced in the rear storage area where new 2" piping is installed. Ten upright heads over the storage area at the front of the building have not been installed yet. The 4" feed and cross main at the front of the store have been rerouted. Plans and hydraulic calculations need to be resubmitted showing all of the changes and as-installed piping.
INSP-Sprinkler Rough-in/Hydro10/13/200910/14/200910/14/2009PCANC
DetailsTroy Cobbley
Overbooked. Rescheduled for tomorrow.
INSP-Sprinkler Rough-in/Hydro9/25/20099/25/20099/25/2009PPASS
DetailsTroy Cobbley
The sprinkler coverage in the deli area has been modified as requested and now the sprinkler piping can be covered.
INSP-Sprinkler Rough-in9/23/20099/24/20099/24/2009APART
DetailsTroy Cobbley
The new sprinkler piping in the dry storage area as marked on the city approved plans can be covered. The piping supply to this area does not match the approved pipe size but I verified through the hydraulic calculations that the pipe size installed was proven. The sprinkler piping in the Deli area can not be covered due to heads being overspaced and lack of protection on either side of the cooking hood.
INSP-Conference9/23/20099/23/20099/23/2009PDONE
DetailsTroy Cobbley
Discussed dry pendant sprinkler spacing in the coolers.
INSP-Sprinkler Rough-in/Hydro9/14/20099/14/20099/14/2009PPASS
DetailsTroy Cobbley
The piping to the 10 pendants in the dry storage area in the rear of the store is ok to cover and the piping in the front canopy is ok to cover. I noted that the unsprinklered area above the sprinkler area of the canopy will required an inspection to verify that the fire retardant has been applied when completed. The general contractor stated that a special inspection was going to be performed to verify correct application of the fire retardant and he would supply paper work for verification.
INSP-Sprinkler Rough-in8/19/20098/19/20098/19/2009PPASS
DetailsTroy Cobbley
The bakery area sprinkler piping can be covered. I noted and discussed with todd overspaced and painted upright sprinkler heads at the new room just to the west of the bakery.
INSP-Final Inspection7/17/20097/17/20097/17/2009PCANC
DetailsTroy Cobbley
Randy Phone #: ###-#### Inspection cancelled from web by: Alexandra Rahn
Issue and Print Permit  7/17/2009 DONE
Plan resubmittals received  7/16/2009  
DetailsTim Frost
Plan assigned to (Tim)7/16/2009 7/16/2009 DONE
DetailsTim Frost
7/16/2009 11:52:52 TRF - activity updated through activity FIRA22 from case FIR09-00291.
Sprinkler Plan Check7/16/2009 7/16/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  7/16/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire7/16/2009 7/16/2009 DONE
Details
Telephone call  7/16/2009 DONE
Details
t/c w shaun at ###-#### - permit ready and fees given
Permit Ready to Issue  7/16/2009 DONE
Details
Plan assigned to (Tim)6/30/2009 7/16/2009 DONE
DetailsTim Frost
7/16/2009 11:52:52 TRF - activity updated through activity FIRA22 from case FIR09-00291.
Telephone call  7/7/2009 DONE
Early start request approved. See file attached in documents.
Miscellaneous action  6/30/2009 DONE
DetailsTim Frost
Emailed comments to Shaun
Telephone call  6/30/2009 DONE
Details
t/c w shaun ramsey at ###-#### - permit denied - needs to be picked up and resubmitted
1st review completed  6/30/2009 DONE
DetailsTim Frost
Sprinkler Plan Check6/30/2009 6/30/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Pending Assignment by SAM5/7/2009 6/26/2009 DONE
DetailsAlexandra L. DeYoung
6/26/2009 11:21:27 ALR - activity updated through activity FIRA158 from case FIR09-00402.
Miscellaneous action  5/7/2009 DONE
DetailsTim Frost
Emailed Demo Approval
Application received  5/7/2009