| INSP-Final Inspection | 9/11/2009 | 9/11/2009 | 9/11/2009 | P | PASS |
Troy Cobbley
|
|
|
See todays entry for corrections.
|
| INSP-Final Inspection | 9/10/2009 | 9/11/2009 | 9/11/2009 | A | PASS |
Troy Cobbley
|
|
|
See todays entry for corrections.
|
| INSP-Sprinkler Rough-in/Hydro | 9/9/2009 | 9/11/2009 | 9/11/2009 | A | PASS |
Troy Cobbley
|
|
|
The 24 hour air test passed on all three dry systems. The trip tests passed on dry system #2 and #3 but failed on system #1. Additional pendants are needed as discussed in the pockets separating the existing gym from the new locker rooms and the missing uprights on system #1 are needed. Per Scott system #1 does not need to be rehydro tested or 24 hour tested.
|
| INSP-Sprinkler Rough-in/Hydro | 9/9/2009 | 9/10/2009 | 9/10/2009 | P | PASS |
Troy Cobbley
|
|
|
Start of 24 hour air test at 12:00. The starting pressures have been written on the wall adjacent to the risers with the current air pressure.
|
| INSP-Sprinkler Rough-in/Hydro | 9/9/2009 | 9/10/2009 | 9/10/2009 | A | PASS |
Troy Cobbley
|
|
|
System #2 passed hydrostatic testing.
|
| INSP-Sprinkler Rough-in/Hydro | 9/9/2009 | 9/9/2009 | 9/9/2009 | P | FAIL |
Forrest France
|
|
|
System #2 failed hydrostatic test. Systems #1,3, and 4 passed hydrostatic tests.
|
| INSP-Sprinkler Rough-in | 8/26/2009 | 8/27/2009 | 8/28/2009 | A | PASS |
Troy Cobbley
|
|
|
System 2 was missing sidewall sprinklers. Checked piping suppling below sprinklers for sizing and hangers. Checked system 3 for head spacing. Missing sprinkler in room 2 One head needs to be changed from an extended coverage to a regular sprinkler in room 21 System 1 over build area are missing sprinklers. System 1 missing upright sprinklers near the peak above the catwalk.
|
| INSP-Sprinkler Rough-in | 8/26/2009 | 8/26/2009 | 8/26/2009 | P | CANC |
Troy Cobbley
|
|
|
Cancelled due to time constraints.
|
| INSP-Sprinkler Rough-in | 8/24/2009 | 8/24/2009 | 8/24/2009 | P | PASS |
Troy Cobbley
|
|
|
The attic portion of system #3 is finished except for verification of correct insulation depth and related sprinkler coverage and the issue with the branchline and main hangers as previously discussed.
|
| INSP-Sprinkler Rough-in | 8/19/2009 | 8/20/2009 | 8/21/2009 | A | PART |
Troy Cobbley
|
|
|
Inspected system 2 piping in the attic for the protection of the ground floor. Everything seemed ok except for the hanger situation which was added as a separate activity in the case file. Inspected system 3 for proper sprinkler coverage. Most of the system was ok. Some areas were not complete and marked in red indicated by NR (Not Reviewed) on the job site plans. Inspected the new addition for cover. All seemed ok except for the door ways leading into the new area. There were doors leading into this area that blocked coverage from the sidewall sprinklers in the gym for the doorways. I was informed that the doors were to be removed. If the doors are not removed than additional sprinklers will be required in both doorways.
|
| Meeting | | | 8/20/2009 | | DONE |
|
|
|
Discussed various hangers options with Trent of Phoenix Fire Protection. Trent indicated that a professional engineer was reviewing the hangers as they are installed. I told him if the engineer was to approved the installation than it would be ok with us, since chapter 9 of NFPA 13 allows for engineering analysis. In addition, I discussed with him installing more hangers on the 4" main in order to limit the point load for each hanger. The other option was to add additional wood below the hangers. I told him the final decision for using additional hangers would rest with the primary inspector Mr. Troy Cobbley or the PDS/Fire Manger Mr. Scott Arellano. However, it sounded like a pracitical solution in my opinion.
|
| INSP-Sprinkler Rough-in | 8/19/2009 | 8/19/2009 | 8/19/2009 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was a rough-to-cover inspection for system 2 (attic). After arriving at the project I found that the latest city approved plans were not on site for the inspection. Instead of leaving I stayed at the fitters request to inspect the dry pendant spacing below the ceilings. Half of the the classrooms were locked. The classrooms that were open had missing pendant heads and the plastic shipping clips had not been removed from many of the pendants. So I stopped with the below ceiling inspecion. At this time plans arrived and I started the attic inspection. As with the previous inspection upright coverage is missing at overbuild areas, heads are spaced too far off of smoke curtains and shear walls, heads are spaced too close together. Also the hangers do not meet the minimum distance from the bottom of the structural members as required for branchlines and mains per NFPA 13 chapter 9. Also per chapter 9 the minimum member size to hang 4" piping is 4 x 3. 2 x4 are being used. I also noted that the sprinkler piping does not match the plans near the riser.
|
| CHANGE STATUS TO (ISS) | | | 8/19/2009 | | DONE |
|
|
|
|
| Plan assigned to (Tim) | 8/11/2009 | | 8/13/2009 | | DONE |
Tim Frost
|
|
|
8/13/2009 15:41:00 TRF - activity updated through activity FIRA22 from case FIR09-00317.
|
| Sprinkler Plan Check | 8/13/2009 | | 8/13/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 8/13/2009 | | DONE |
Tim Frost
|
|
|
|
| Inspection Record Card- Fire | 8/13/2009 | | 8/13/2009 | | DONE |
|
|
|
|
| Telephone call | | | 8/13/2009 | | DONE |
|
|
|
left vm for don at ###-#### - permit (plan mod) ready and fees given
|
| Permit Ready to Issue | | | 8/13/2009 | | DONE |
|
|
|
|
| INSP-Supply line flush | 7/30/2009 | 7/31/2009 | 7/31/2009 | P | PASS |
Troy Cobbley
|
|
|
The underground supply line flush passed inspection.
|
| INSP-Sprinkler Rough-in/Hydro | 7/30/2009 | 7/31/2009 | 7/31/2009 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
| INSP-Sprinkler Rough-in | 7/23/2009 | 7/24/2009 | 7/24/2009 | A | PART |
Forrest France
|
|
|
Underground fire supply line approved for cover, need to install cap or blind flange at the riser stub.
|
| INSP-Sprinkler Rough-in | 7/21/2009 | 7/22/2009 | 7/22/2009 | A | PART |
Troy Cobbley
|
|
|
The rough-in for system #3 was completed. See the city approved plans for locations of deficiencies.
|
| Sprinkler Plan Check | 7/10/2009 | | 7/10/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2009 | | DONE |
Tim Frost
|
|
|
|
| Inspection Record Card- Fire | 7/10/2009 | | 7/10/2009 | | DONE |
|
|
|
|
| Telephone call | | | 7/10/2009 | | DONE |
|
|
|
t/c w don weland at ###-#### - permit ready and fees given
|
| Permit Ready to Issue | | | 7/10/2009 | | DONE |
|
|
|
|
| Issue and Print Permit | | | 7/10/2009 | | DONE |
|
|
|
|
| Plan resubmittals received | | | 7/8/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
rec'd three copies of submittal packets
|
| Miscellaneous action | | | 7/8/2009 | | DONE |
Tim Frost
|
|
|
Email, see attached
|
| Sprinkler Plan Check | 7/2/2009 | | 7/2/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
| Miscellaneous action | | | 7/2/2009 | | DONE |
|
|
|
Emailed comments
|
| Telephone call | | | 7/2/2009 | | DONE |
|
|
|
t/c w don weland at ###-#### - permit denied - needs to be picked up and resubmitted
|
| Plan resubmittals received | | | 7/1/2009 | | |
Tim Frost
|
|
|
Rec'd 3 copies of plans and 3 copies of submittal packets
|
| Sprinkler Plan Check | 6/18/2009 | | 6/18/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
| Telephone call | | | 6/18/2009 | | DONE |
|
|
|
left vm for don at ###-#### - permit denied - needs to be picked up and resubmitted
|
| Plan resubmittals received | | | 6/12/2009 | | |
Tim Frost
|
|
|
Rec'd 3 copies- taken to Tim
|
| Plan assigned to (Tim) | 5/22/2009 | | 5/27/2009 | | DONE |
Tim Frost
|
|
|
|
| Sprinkler Plan Check | 5/27/2009 | | 5/27/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
| Telephone call | | | 5/27/2009 | | DONE |
Barbara Stitt
|
|
|
Called and spoke with trent and told him that plans were denied///5-27-09 @ 3:36pm BAS
|
| Plan resubmittals received | | | 5/22/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Rec'd 3 copies of application, submittal info, and plans- taken to fire review
|
| Plan assigned to (Tim) | 5/13/2009 | | 5/15/2009 | | DONE |
Tim Frost
|
|
|
05-27-09 New
|
| Sprinkler Plan Check | 5/15/2009 | | 5/15/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
| Meeting | | | 5/15/2009 | | DONE |
Tim Frost
|
|
|
Gave denined plans back to contractor. Discuss the various problems with the plans. Marked up one set of plans for his reference.
|
| Application received | | | 5/13/2009 | | |
|
|
|
|
| Meeting | | | 5/13/2009 | | DONE |
Tim Frost
|
|
|
Intake meeting to go over plans with contractor.
|