Permit Information
Permit NumberFIR09-00347
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 2822 S VISTA AVE
Project NamePacific Cataract & Laser Insti
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of 160' of 6" C-900 underground piping and fittings. There will be a riser room with a separate outside door. The installation shall conform to NFPA13, 24, BMC, IFC and IDAPA. This permit is for the underground only. The overhead piping will be under a separate permit.

Pacific Cataract & Laser Institute - To construct a new 9,365 square foot, one story with 1,285 square foot mechanical mezzanine, wood framed medical office building (outpatient eye clinic) and related site improvements. This building is fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/8/2010 DONE
Plans sent to scanning.
INSP-Final Inspection2/4/20102/5/20102/9/2010APASS
DetailsForrest France
Underground fire supply line permit final approved.
INSP-Final Inspection1/26/20101/28/20101/28/2010ANR
DetailsForrest France
Pending project related fire alarm permit finals.
INSP-Sprinkler Rough-in/Hydro12/14/200912/15/200912/15/2009APART
DetailsForrest France
Hydrostatic testing for the overhead system piping completed satisfactory, also okayed for cover heads in drop ceilings at the first floor.
INSP-Final Inspection11/27/200911/27/200911/27/2009APART
DetailsForrest France
See stamped plans and permit activity notes for inspections completed to date.
INSP-Supply line flush11/17/200911/18/200911/18/2009APASS
DetailsTroy Cobbley
Underground supply line flush passed
INSP-Final Inspection11/16/200911/16/200911/16/2009PPART
DetailsForrest France
Final pending forward flow and main drain tests when riser is finished.
INSP-Sprinkler Rough-in/Hydro10/15/200910/15/200910/15/2009PPASS
DetailsTroy Cobbley
The underground hydro test passed. Inspection was performed by tim.
INSP-Sprinkler Rough-in/Hydro10/14/200910/15/200910/15/2009ACANC
DetailsSteven Webb
jake - underground hydro Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro10/14/200910/14/200910/14/2009PCANC
DetailsTroy Cobbley
Overbooked. I spoke to Jake and will reschedule for tomorrow.
INSP-Sprinkler Rough-in/Hydro10/13/200910/14/200910/14/2009AFAIL
DetailsTroy Cobbley
No one answered the contact phone number and when I got to the project I could not find any sprinkler fitters. No inspection was performed.
INSP-Final Inspection8/21/20098/24/20098/21/2009PCANC
DetailsForrest France
Scheduled by a contractor via Hello! on 8/21/2009 at 9:39:55 AM. Disp set to [CANC] by a contractor via Hello! on Aug 21 2009 9:40AM.
INSP-Sprinkler Rough-in/Hydro7/21/20097/21/20097/21/2009PPART
DetailsForrest France
Remainder of underground fire supply line piping okayed for cover-see initialed red line annotations on approved plans.
INSP-Sprinkler Rough-in/Hydro7/21/20097/21/20097/21/2009PCANC
DetailsForrest France
Scheduled by a contractor via Hello! on 7/21/2009 at 8:27:36 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 21 2009 8:29AM.
INSP-Sprinkler Rough-in/Hydro7/15/20097/16/20097/16/2009APASS
DetailsTroy Cobbley
Underground piping okay to cover as marked on plans. This is a partial cover inspection only of the underground.
Issue and Print Permit  6/3/2009 DONE
Plan assigned to (Tim)6/1/2009 6/2/2009 DONE
DetailsTim Frost
6/2/2009 10:13:30 TRF - activity updated through activity FIRA22 from case FIR09-00347.
Sprinkler Plan Check6/2/2009 6/2/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  6/2/2009 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/2/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire6/2/2009 6/2/2009 DONE
Details
Telephone call  6/2/2009 DONE
Details
left vm for jim at ###-#### - permit ready and fees given
Permit Ready to Issue  6/2/2009 DONE
Details
Telephone call  6/1/2009 DONE
DetailsTim Frost
Called PWEagle company to verify if their C909 piping complies with NFPA 24 and is UL listed. The plans show C-900 however the literature submitted indicates C909. I left a voice mail an am awaiting a phone call back.
Application received  5/29/2009  
Case Summary  5/29/2009 DONE