Information based on query as of Thursday, September 26, 2024.
Permit Information
Permit NumberFIR09-00394
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 222 S BROADWAY AVE
Project NameMarriott
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of relocating and adding sprinklers to accommodate new ceiling and wall configurations.

(MARRIOTT - Lobby Renovation) Permit is to remodel an existing hotel lobby for new furnishing, media equipment, expanded coffee bar, modified general manager's office, and new market area. Approval per approved plans on file and CZC09-00016. Work to include: demolition of existing interior non-bearing walls, construction of new interior non-bearing walls to create a market area and a newly defined general managers office, installation of new lighting, new pluming associated with coffee bar, relocating ducts and diffusers, new doors and hardware, new accessible sales and service counter, and interior finishes in compliance with chapter 8 of the 2006 IBC. New C of O is for Lobby and scope of work shown on these plans only. This is not a C of O for the entire building. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/23/20099/23/20099/24/2009PPASS
DetailsForrest France
Correction notice item completed, fire sprinkler permit okay for final.
INSP-Final Inspection9/21/20099/22/20099/22/2009AFAIL
DetailsForrest France
Millwork at the reception "area 102" obstructs sprinkler coverage, remainder of install passed, previous C/N items are finished.
INSP-Sprinkler Rough-in9/1/20099/1/20099/2/2009ANR
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro8/10/20098/11/20098/11/2009AFAIL
DetailsForrest France
New pendent heads installed at the office area do not match approved plans and submittals, must also be quick response type per IFC 2006 903.3.2 (3).
INSP-Sprinkler Rough-in/Hydro7/23/20097/24/20097/24/2009PPART
DetailsForrest France
See stamped plan set on site for locations inspected today and approved for cover at the sheetrock ceilings including the 1st floor lobby.
Plan assigned to (Tim)6/23/2009 6/24/2009 DONE
DetailsTim Frost
6/24/2009 08:52:56 TRF - activity updated through activity FIRA22 from case FIR09-00394.
Sprinkler Plan Check6/24/2009 6/24/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  6/24/2009 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/24/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire6/24/2009 6/24/2009 DONE
Details
Telephone call  6/24/2009 DONE
Details
t/c w jeff anderson at ###-#### - permit ready and fees given
Permit Ready to Issue  6/24/2009 DONE
Details
Issue and Print Permit  6/24/2009 DONE
DetailsAlexandra L. DeYoung
Case Summary  6/23/2009 DONE
Application received  6/23/2009