Permit Information
Permit NumberFIR09-00408
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 4450 N FIVE MILE RD
Project NamePriest Retirement House
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of connecting to untied water 8" stub in at the property line and installing approximately 100' of 6" C-900 PVC and 6" Ames IBR. This will supply the new overhead sprinkler system that will be submitted at a later date under a separate. Permit.

Priest Retirement Home - To construct a new 16,377 square feet, one story, eight unit, apartment building with common areas and attached garages for retiring Catholic Priests. Each unit has two bedrooms, two bathrooms, a kitchen, and a 55 square feet patio. Each unit has a separate means of egress and also share a common path of egress into and through a 1/2-hour exit corridor with 20 minute fire-resistive, listed, labeled, self-closing door assemblies from the dwelling units into the corridor. All eight units are required to comply as Type 'B' accessible dwelling units. All construction shall be per the approved plans, engineering, and attached plan review report. NOTE: This building is required to be fully fire sprinklered per NFPA 13. CUP07-00171 **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/8/2010 DONE
Plans sent to scanning.
INSP-Final Inspection11/30/200912/1/200912/1/2009APASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush11/30/200911/30/200911/30/2009PPASS
DetailsTroy Cobbley
The underground flush passed.
INSP-Sprinkler Rough-in/Hydro11/10/200911/10/200911/10/2009PPART
DetailsTroy Cobbley
The underground hydro test passed. The two overhead hydro tests failed.
INSP-Sprinkler Rough-in/Hydro11/5/200911/5/200911/5/2009PFAIL
DetailsTroy Cobbley
The end of the underground hydro was canceled by sam via phone.
INSP-Sprinkler Rough-in8/13/20098/14/20098/14/2009APASS
DetailsTroy Cobbley
The remaining underground supply piping is ok to cover.
INSP-Supply line flush8/13/20098/13/20098/14/2009PPART
DetailsTroy Cobbley
The underground supply piping is ok to cover except where the thrust blocks are needed.
INSP-Sprinkler Rough-in7/10/20097/13/20097/13/2009PPART
DetailsTroy Cobbley
The underground supply stub out only is ok to cover. I spoke to the general contractor and to Sam Ball about the minimum depth of cover which might not be met once the piping is out from under the sidewalk.
Issue and Print Permit  7/9/2009 DONE
Plan assigned to (Tim)7/2/2009 7/8/2009 DONE
DetailsTim Frost
7/8/2009 11:12:50 TRF - activity updated through activity FIRA22 from case FIR09-00408.
Sprinkler Plan Check7/8/2009 7/8/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  7/8/2009 DONE
DetailsTim Frost
1st review completed  7/8/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire7/8/2009 7/8/2009 DONE
DetailsBarbara Stitt
Permit Ready to Issue  7/8/2009 DONE
DetailsBarbara Stitt
Telephone call  7/8/2009 DONE
DetailsBarbara Stitt
Called and told Lisa that permit is ready and fees due///7-8-09 @ 12:00pm BAS
Plan resubmittals received  7/2/2009  
DetailsTisha Gallop
received four copies of application and sheet 1 of 1; taken to fire review
Plan assigned to (Tim)6/30/2009 7/1/2009 DONE
DetailsTim Frost
Miscellaneous action  7/1/2009 DONE
Emailed letter
Application received  6/30/2009 DONE
DetailsBarbara Stitt