Information based on query as of Tuesday, September 17, 2024.
Permit Information
Permit NumberFIR09-00419
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 320 N ALLUMBAUGH
Project NameDetox Center
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of connecting to a united water 6" flushing valve and installing approximately 87' of 6" C-900 PVC underground piping. This will supply the new overhead sprinkler system that will be submitted at a later date under a separate permit.

(Region Four Substance Abuse and Mental Health Crisis Center) - To construct a 9,189 sq. ft. building for use as and "I-2" occupancy care & treatment facility. This building is fully sprinklered as required for occupancy use group. Work includes perimeter footings, foundation, floor/wall/roof construction, interior walls to create rooms & support areas for short term stay / treatment rooms, staff observation and work stations and accessible restrooms & bathing facilities throughout building; installation of electrical, mechanical, plumbing, sprinkler & alarm systems, interior & exterior finishes & millwork; and all associated site work. drs (CUP08-00139) (DRH08-00404)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/23/20102/23/20102/23/2010PPASS
DetailsForrest France
UG fire supply line permit work okay for final status per activity notes and overhead system testing for project related FIR's.
CHANGE STATUS TO (ISS)  1/5/2010 DONE
DetailsBarbara Stitt
No resubmittals here changed back to issue status 1-5-10 BAS
Plan resubmittals received  12/18/2009 DONE
DetailsBarbara Stitt
Plan assigned to (Tim)12/18/2009 12/18/2009 DONE
DetailsTim Frost
INSP-Alarm Testing12/10/200912/11/200912/11/2009PCANC
DetailsTroy Cobbley
Wrong inspection type called in.
INSP-Supply line flush12/2/200912/3/200912/3/2009APASS
DetailsTroy Cobbley
The underground flush passed.
INSP-Sprinkler Rough-in/Hydro12/1/200912/1/200912/1/2009PPASS
DetailsTroy Cobbley
Underground hydro test passed.
INSP-Sprinkler Rough-in7/20/20097/21/20097/21/2009PPASS
DetailsTroy Cobbley
The 6" underground supply piping is ok to cover.
INSP-Sprinkler Rough-in7/16/20097/17/20097/17/2009AFAIL
DetailsTroy Cobbley
The new 6" underground supply piping does not meet the state requirement of a minumum 4'-6" bury depth. I went over the depth of bury with EKC while on site and contacted Trent with Phoenix Fire. Pipe can not be buried until re-inspected.
INSP-Sprinkler Rough-in7/16/20097/16/20097/16/2009PCANC
DetailsTroy Cobbley
Rescheduled for tomorrow morning due to time constraints today.
Permit Ready to Issue  7/9/2009 DONE
Inspection Record Card- Fire7/9/2009 7/9/2009 DONE
DetailsBarbara Stitt
Telephone call  7/9/2009 DONE
DetailsBarbara Stitt
Called and left message for Trent that permit is ready & fees due///7-9-09 @ 9:15am BAS
Issue and Print Permit  7/9/2009 DONE
DetailsAlexandra L. DeYoung
Plan assigned to (Tim)7/7/2009 7/8/2009 DONE
DetailsTim Frost
7/8/2009 14:43:00 TRF - activity updated through activity FIRA22 from case FIR09-00419.
Sprinkler Plan Check7/8/2009 7/8/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  7/8/2009 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  7/8/2009 DONE
DetailsTim Frost
Application received  7/7/2009