INSP-Final Inspection | 8/18/2009 | 8/19/2009 | 8/20/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed field inspection, permit finaled.
|
Sprinkler Plan Check | 7/20/2009 | | 7/20/2009 | | PASS |
|
|
|
Plan modification approved on site by Troy Cobbley
|
Sprinkler Plan Check | 7/9/2009 | | 7/9/2009 | | PASS |
Troy Cobbley
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2009 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/9/2009 | | DONE |
|
|
|
|
Plan assigned to (Scott) | | | 7/8/2009 | | DONE |
Sam Rogers
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (SAM) | | | 7/8/2009 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|