Permit Information
Permit NumberFIR09-00424
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1951 S SATURN WAY Unit: 100
Project NameAmalgamated Sugar Co.
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of relocating sprinklers to accommodate a new ceiling and wall configuration. The existing system is a 2 ½"x2"x1 ¼" grid. In addition, a new double interlock preaction system will be installed to protect a computer room. Two branch lines are being rerouted around the new computer room.

(AMALGAMATED SUGAR COMPANY) Remodel for a 23,116 sq. ft. tenant in an existing building to include demolition of existing office areas and construction of new office layout. Existing lay-in ceiling to remain where possible, new interior finishes where required with minor exterior storefront work per approved plans. Work to include: construction of interior partitions creating; individual office areas, open office area, small conference rooms, computer room, board room, training room, storage area, break room, and reception areas. Installation of a suspended ceiling system, installation of new HVAC unit, miscellaneous related interior finishes, fire sprinkler work, new mechanical, new plumbing, and new electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase, any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. CZC09-00127 **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/25/20098/26/20098/26/2009APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection8/25/20098/26/20098/26/2009APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in8/20/20098/21/20098/21/2009APASS
DetailsTroy Cobbley
Sprinklers ok to cover
INSP-Sprinkler Rough-in/Hydro8/12/20098/13/20098/13/2009APASS
DetailsTroy Cobbley
The 24 air test passed.
INSP-Sprinkler Rough-in8/12/20098/12/20098/12/2009PPASS
DetailsTroy Cobbley
The 24 hour air test was started at 11:00 with 43 psi on the guage.
INSP-Sprinkler Rough-in/Hydro8/11/20098/11/20098/11/2009PPASS
DetailsTroy Cobbley
The overhead hydro test of the new pre-action system passed.
INSP-Sprinkler Rough-in8/7/20098/7/20098/7/2009PFAIL
DetailsTroy Cobbley
No city approved drawings were on site for the inspection.
Plan assigned to (Tim)7/10/2009 7/13/2009 DONE
DetailsTim Frost
7/13/2009 11:52:02 TRF - activity updated through activity FIRA22 from case FIR09-00424.
Sprinkler Plan Check7/13/2009 7/13/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  7/13/2009 DONE
DetailsTim Frost
1st review completed  7/13/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire7/13/2009 7/13/2009 DONE
Details
Telephone call  7/13/2009 DONE
Details
left vm for brodie at ###-#### - permit ready and fees given
Permit Ready to Issue  7/13/2009 DONE
Details
Issue and Print Permit  7/13/2009 DONE
DetailsAlexandra L. DeYoung
Application received  7/10/2009  
Pending Assignment by SAM7/10/2009 7/10/2009 DONE
DetailsTisha Gallop
7/10/2009 12:51:26 LEG - activity updated through activity FIRA158 from case FIR09-00424.