INSP-Final Inspection | 9/8/2009 | 9/9/2009 | 9/9/2009 | A | PASS |
Forrest France
|
|
|
Fire alarm testing passed, permit finaled.
|
INSP-Final Inspection | 8/26/2009 | 8/27/2009 | 8/27/2009 | P | CANC |
Troy Cobbley
|
|
|
Cancel per jeff. Will be rescheduled.
|
INSP-Final Inspection | 8/25/2009 | 8/26/2009 | 8/26/2009 | A | CANC |
Troy Cobbley
|
|
|
Cancelled due to time constraints. No inspection was performed.
|
Issue and Print Permit | | | 8/21/2009 | | DONE |
|
|
|
|
Alarm Plan Check | 7/20/2009 | | 7/20/2009 | | PASS |
|
|
|
Approved per on-site field plan review by Troy Cobbley
|
PLANS TAKEN FRONT DESK ALARM | | | 7/20/2009 | | DONE |
|
|
|
|
Plan assigned to (Scott) | 7/14/2009 | | 7/14/2009 | | DONE |
Troy Cobbley
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (SAM) | | | 7/14/2009 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|
1st review completed | | | 7/14/2009 | | DONE |
|
|
|
|