Permit Information
Permit NumberFIR09-00440
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 10139 W OVERLAND RD
Project NameSpring Creek - Assisted Living
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of two systems, one anti-freeze for the attic and one wet for the below the ceiling. The wet system will be protected from freezing by tenting. The sprinklers in the dwelling units' room are residential type. The attic sprinklers are special application sprinklers BB and AP. The system is supply by a new 6" CPVC C-900 main. The system has a 4" RPZ, 4" anti-freeze riser and a 2 wet riser. This is to be a fully sprinklered building with listed equipment. The building is located in a seismic category C.

Spring Creek Overland - Senior Assisted-Living - Building D - Project consists of construction and finish of a 26,506 sq. ft., 42 sleeping unit, 50 beds, Senior Assisted Living Development with support facilities and associated site work, all per reviewed plans. To construct 18 one bedroom @ 552 sq. ft.; 12 Large Studio units @ 384 sq. ft.; 6 Small Studio Units @ 300 sq. ft.; and 6 Private HC units @ 227 sq. ft., six fully accessible units and 36 Type 'B' accessible units. drs DRH08-00246 CUP08-00010
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/8/2010 DONE
Plans sent to scanning.
INSP-Final Inspection2/18/20102/19/20102/19/2010APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection2/18/20102/18/20102/18/2010PFAIL
DetailsTroy Cobbley
Due to time constraits I was unable to complete the entire inspection. The forward flush passed as well as the fire alarm interconnections. Verification of ceiling installation, canopy installation and any possible blocked heads due to light fixtures still needs to be completed.
INSP-Sprinkler Rough-in/Hydro12/3/200912/3/200912/3/2009PPASS
DetailsTroy Cobbley
The sprinkler piping can now be covered.
INSP-Sprinkler Rough-in/Hydro12/2/200912/3/200912/3/2009APASS
DetailsTroy Cobbley
The overhead piping passed the hydro tests.
INSP-Sprinkler Rough-in12/1/200912/2/200912/2/2009PPART
DetailsTroy Cobbley
Piping is ok to cover except at the top of the vertical risers which will require additional insulation and the voids under both fire places needs filled with insulation as well.
INSP-Sprinkler Rough-in11/24/200911/27/200911/27/2009APASS
DetailsTroy Cobbley
The previous items on the correction notice have been corrected. The piping still can not be covered until the combustible concealed spaces throughout the facility, including at the fire places have been addressed and the veritical cpvc piping is insulated. These items need to be inspected prior to cover.
INSP-Sprinkler Rough-in11/23/200911/24/200911/24/2009APART
DetailsTroy Cobbley
All of the attic system was inspected as well as just the east wing of the wet system. In several locations the sidewall heads are too close to one another and once the ceiling is installed may be too close to the ceiling. The contractor needs to contact Tim Frost about changes that could adversely effect the attic system hydraulic calculations. The location of acouple of the upright sprinkler heads need to be modified to provide correct sprinkler coverage. Earthquake bracing needs to be modified so that the "earthquake ears" are not used as discussed.
Sprinkler Plan Check9/11/2009 9/11/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  9/11/2009 DONE
DetailsTim Frost
Override - Parcel Holds  9/11/2009  
Override - Parcel Holds  9/11/2009  
Inspection Record Card- Fire9/11/2009 9/11/2009 DONE
Details
Telephone call  9/11/2009 DONE
Details
t/c w kim at ###-#### - permit ready and fees given
Override - Parcel Holds  9/11/2009  
Override - Parcel Holds  9/11/2009  
Permit Ready to Issue  9/11/2009 DONE
Details
Override - Parcel Holds  9/11/2009  
Override - Parcel Holds  9/11/2009  
Issue and Print Permit  9/11/2009 DONE
Plan resubmittals received  9/3/2009  
DetailsTim Frost
Rec'd 4 copies of plans and submittal info- taken to Tim F
Plan assigned to (Tim)7/16/2009 7/20/2009 DONE
DetailsTim Frost
Sprinkler Plan Check7/20/2009 7/20/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  7/20/2009 DONE
DetailsTim Frost
Miscellaneous action  7/20/2009 DONE
DetailsTim Frost
Emailed review to Matt Kahns
Telephone call  7/20/2009 DONE
Details
t/c w bryan johnson at ###-#### - permit denied - needs to be picked up and resubmitted
Application received  7/16/2009  
Pending Assignment by SAM7/16/2009 7/16/2009 DONE
DetailsTisha Gallop
7/16/2009 08:11:38 LEG - activity updated through activity FIRA158 from case FIR09-00440.