INSP-Final Inspection | 10/8/2009 | 10/9/2009 | 10/9/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Inspection performed and passed by Tim Frost.
|
INSP-Final Inspection | 8/12/2009 | 8/13/2009 | 8/13/2009 | P | NR |
Forrest France
|
|
|
Project is not ready for final, walls to separate sprinklered and non-sprinklered areas are not built, the new storage room as shown on building plans is not drawn on sprinkler plans-coverage to be verified when room is constructed, new mechanical room per the scope of building permit work is not properly protected, noted main and branchline pipe sizes have been changed per red-lines.
|
Issue and Print Permit | | | 7/27/2009 | | |
|
|
|
|
Plan assigned to (Tim) | 7/17/2009 | | 7/20/2009 | | DONE |
Tim Frost
|
|
|
7/20/2009 14:14:14 TRF - activity updated through activity FIRA22 from case FIR09-00442.
|
Sprinkler Plan Check | 7/20/2009 | | 7/20/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/20/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/20/2009 | | 7/20/2009 | | DONE |
|
|
|
|
Telephone call | | | 7/20/2009 | | DONE |
|
|
|
t/c w cameron hess at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/20/2009 | | DONE |
|
|
|
|
Application received | | | 7/17/2009 | | |
|
|
|
|
Pending Assignment by SAM | 7/17/2009 | | 7/17/2009 | | DONE |
Tisha Gallop
|
|
|
7/17/2009 08:32:15 LEG - activity updated through activity FIRA158 from case FIR09-00442.
|