Miscellaneous action | | | 3/8/2010 | | DONE |
|
|
|
Plans sent to scanning.
|
INSP-Final Inspection | 1/29/2010 | 2/1/2010 | 2/1/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 1/26/2010 | 1/26/2010 | 1/26/2010 | P | FAIL |
Troy Cobbley
|
|
|
Once the fire alarm interconnects have been tested this permit can be finaled. The forward flush test passed. I notified the building contractor that the fire sprinkler riser room does not meet the one hour rating requirement per boise city ordinance.
|
INSP-Sprinkler Rough-in/Hydro | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PASS |
Troy Cobbley
|
|
|
THe above ground hydro tests passed for both of the overhead systems.
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2009 | 11/20/2009 | 11/20/2009 | P | FAIL |
Troy Cobbley
|
|
|
Both of the overhead systems failed their hydro tests. I found three different locations where water was leaking out of the system and collecting in the baggies on the sprinkler pendants.
|
INSP-Sprinkler Rough-in | 10/1/2009 | 10/1/2009 | 10/1/2009 | P | PASS |
Troy Cobbley
|
|
|
The remaing sprinkler piping can be covered. The tenting is complete.
|
INSP-Sprinkler Rough-in | 9/30/2009 | 9/30/2009 | 9/30/2009 | P | PART |
Troy Cobbley
|
|
|
The sprinkler piping in the north wing/half of the building can be covered since the tenting has been completed. The tenting in other areas of the building has not been completed.
|
INSP-Sprinkler Rough-in/Hydro | 9/28/2009 | 9/29/2009 | 9/29/2009 | A | PASS |
Troy Cobbley
|
|
|
The rough-in for the anti-freeze system and the wet system passed. Two uprights had to be added to cover two overbuild areas. Piping can not be covered due to the tenting being incomplete in many areas. The riser has not been built yet.
|
INSP-Sprinkler Rough-in | 9/28/2009 | 9/28/2009 | 9/28/2009 | P | PASS |
Troy Cobbley
|
|
|
The anti-freeze system up to the northwest wall was inspected and passed except for a small combustible pocket that required protection.
|
Issue and Print Permit | | | 7/27/2009 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/21/2009 | | 7/22/2009 | | DONE |
Tim Frost
|
|
|
7/22/2009 13:04:42 TRF - activity updated through activity FIRA22 from case FIR09-00448.
|
Sprinkler Plan Check | 7/22/2009 | | 7/22/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/22/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/22/2009 | | 7/22/2009 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2009 | | DONE |
|
|
|
left vm for lisa at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/22/2009 | | DONE |
|
|
|
|
Application received | | | 7/21/2009 | | |
|
|
|
|
Pending Assignment by SAM | 7/21/2009 | | 7/21/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
7/21/2009 11:27:07 ALR - activity updated through activity FIRA158 from case FIR09-00448.
|