INSP-Final Inspection | 8/20/2009 | 8/20/2009 | 8/21/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 8/14/2009 | 8/14/2009 | 8/14/2009 | A | PASS |
Troy Cobbley
|
|
|
Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 8/12/2009 | 8/13/2009 | 8/13/2009 | A | FAIL |
Troy Cobbley
|
|
|
Too many heads have been supplied from a single 1" outlet without verification of meeting all requirements of the use of Room Design method. Don and I discussed this topic extensively and he is going to follow up on wall ratings or provide separate supplies. Also insulation in hanging down from the deck blocking sprinkler coverage.
|
Issue and Print Permit | | | 8/10/2009 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/27/2009 | | 7/28/2009 | | DONE |
Tim Frost
|
|
|
7/28/2009 08:07:23 TRF - activity updated through activity FIRA22 from case FIR09-00454.
|
Sprinkler Plan Check | 7/28/2009 | | 7/28/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/28/2009 | | 7/28/2009 | | DONE |
|
|
|
|
Telephone call | | | 7/28/2009 | | DONE |
|
|
|
t/c w don curtis at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/28/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/27/2009 | | |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/27/2009 | | 7/27/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are annotations on the plans.
|
1st review completed | | | 7/27/2009 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/24/2009 | | |
|
|
|
|