INSP-Final Inspection | 9/4/2009 | 9/4/2009 | 9/4/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection.
|
INSP-Final Inspection | 9/1/2009 | 9/3/2009 | 9/3/2009 | A | CANC |
Forrest France
|
|
|
Overbooked
|
INSP-Final Inspection | 8/17/2009 | 8/18/2009 | 8/18/2009 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for a rough-in since the ceiling tile had not been installed. One hanger on the upper level needs to be attached to the top chord of the truss instead of the bottom chord. Also Tim Frost is ok with the extended coverage head being used for 10' x 10' spacing. Piping is ok to cover.
|
Telephone call | | | 8/18/2009 | | DONE |
|
|
|
Spoke with Rick at Viking. He indicated the above sprinklers are spaced at 20'x20' ordinary hazard 2. The new area is a light hazard area. I told him that it was ok to use the same spacing of 20'x20' in this area since the sprinklers are approved for that distance and the hazard classification is less.
|
Application received | | | 7/29/2009 | | |
|
|
|
|
Sprinkler Plan Check | 7/29/2009 | | 7/29/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 7/29/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/29/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 7/29/2009 | | 7/29/2009 | | DONE |
|
|
|
|
Telephone call | | | 7/29/2009 | | DONE |
|
|
|
t/c w george at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/29/2009 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/29/2009 | | DONE |
|
|
|
|
Pending Assignment by SAM | 7/29/2009 | | | | |
|
|
|
|