Miscellaneous action | | | 1/6/2010 | | DONE |
Tim Frost
|
|
|
Taken for scanning
|
INSP-Final Inspection | 12/11/2009 | 12/14/2009 | 12/14/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection, contractor to provide "911" sign at the outside bell as discussed.
|
INSP-Sprinkler Rough-in/Hydro | 11/24/2009 | 11/24/2009 | 11/27/2009 | P | PART |
Forrest France
|
|
|
Okay to cover overhead per activity notes.
|
INSP-Sprinkler Rough-in | 10/28/2009 | 10/29/2009 | 10/29/2009 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok for cover. Tenting is complete. Several locations needed to be modified while I waited.
|
INSP-Sprinkler Rough-in/Hydro | 10/28/2009 | 10/28/2009 | 10/28/2009 | P | NR |
Forrest France
|
|
|
Insulation work incomplete, not ready for inspection at this time per contractor.
|
INSP-Sprinkler Rough-in/Hydro | 10/23/2009 | 10/23/2009 | 10/23/2009 | A | PART |
Forrest France
|
|
|
See notes on stamped plan set.
|
INSP-Sprinkler Rough-in | 10/21/2009 | 10/21/2009 | 10/22/2009 | P | PART |
Forrest France
|
|
|
Duplicate, see site inspection comments 10/22.
|
INSP-Sprinkler Rough-in/Hydro | 10/22/2009 | 10/22/2009 | 10/22/2009 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler rough-in inspection passed with the exception of two locations marked on plans in need of hangers/branchline restraint, cover is not approved until tenting/insulation is completed and inspected for cold cavity protection, be aware of light fixure obstructions that may develop depending on equipment installed, minor field mods. in pipe runs okayed due to 20% cushion in calcs, riser is not yet built.
|
Issue and Print Permit | | | 9/16/2009 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/1/2009 | | 9/1/2009 | | DONE |
|
|
|
|
Telephone call | | | 9/1/2009 | | DONE |
|
|
|
left vm for don curtis at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/1/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/31/2009 | | |
Tisha Gallop
|
|
|
received three copies of application, hydraulic calcs, submittal documents and four copies of plan sheets FP-1, FP-2; taken to Fire Review
|
Plan assigned to (Tim) | 8/31/2009 | | 8/31/2009 | | DONE |
Tim Frost
|
|
|
8/31/2009 13:49:03 TRF - activity updated through activity FIRA22 from case FIR09-00479.
|
Sprinkler Plan Check | 8/31/2009 | | 8/31/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2009 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/25/2009 | | 8/25/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Meeting | | | 8/25/2009 | | DONE |
|
|
|
Emailed comments
|
Telephone call | | | 8/25/2009 | | DONE |
|
|
|
Left voice message for Donald Curtis that plans failed and can be picked up and re-submitted///8-25-09 @ 12:45pm BAS
|
Plan resubmittals received | | | 8/24/2009 | | |
Tim Frost
|
|
|
Rec'd 3 copies of plans and app
|
Plan assigned to (Tim) | 8/11/2009 | | 8/12/2009 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/12/2009 | | 8/12/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/12/2009 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 8/12/2009 | | DONE |
|
|
|
t/c w don curtis at ###-#### - permit denied - needs to be picked up and resubmitted
|
Application received | | | 8/11/2009 | | |
|
|
|
|
Pending Assignment by SAM | 8/11/2009 | | 8/11/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
8/11/2009 08:42:09 ALR - activity updated through activity FIRA158 from case FIR09-00479.
|