Miscellaneous action | | | 1/6/2010 | | DONE |
Tim Frost
|
|
|
Taken for scanning
|
INSP-Final Inspection | 10/23/2009 | 10/26/2009 | 10/27/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 10/22/2009 | 10/23/2009 | 10/23/2009 | A | PASS |
Troy Cobbley
|
|
|
The overhead hydro and verification of previous corrections passed. I went over items needed for the final such as fire alarm interconnections, signage at the riser, forward flow verification.....ect.
|
INSP-Sprinkler Rough-in/Hydro | 10/22/2009 | 10/22/2009 | 10/22/2009 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. Rescheduled with Joe for tomorrow morning.
|
INSP-Supply line flush | 10/20/2009 | 10/21/2009 | 10/21/2009 | A | PASS |
Troy Cobbley
|
|
|
The underground supply flush passed inspection.
|
INSP-Supply line flush | 10/16/2009 | 10/19/2009 | 10/19/2009 | A | CANC |
Troy Cobbley
|
|
|
Canceled per Joe until the backflow preventor is removed.
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2009 | 10/19/2009 | 10/19/2009 | A | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed. The amount of water lost was verified ok against the amount allowed in NFPA 13.
|
INSP-Supply line flush | 10/19/2009 | 10/19/2009 | 10/19/2009 | P | CANC |
Troy Cobbley
|
|
|
we would like to follow the previously scheduled hydro with this flush. Phone #: ###-#### Internet Inspection Request from: Scott Carter II Inspection cancelled from web by: Scott Carter II
|
INSP-Sprinkler Rough-in/Hydro | 10/19/2009 | 10/19/2009 | 10/19/2009 | P | CANC |
Troy Cobbley
|
|
|
underground hydro. please call 1 hour prior to inspection. Thank you Phone #: ###-#### Internet Inspection Request from: Michelle Carter Inspection cancelled from web by: Scott Carter II
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2009 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/16/2009 | | 10/16/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
CHANGE STATUS TO (ISS) | | | 10/16/2009 | | |
|
|
|
|
Inspection Record Card- Fire | 10/16/2009 | | 10/16/2009 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/16/2009 | | DONE |
|
|
|
|
Telephone call | | | 10/16/2009 | | DONE |
|
|
|
t/c w brent at ###-#### - permit ready (plan mod) and fees given
|
Issue and Print Permit | | | 10/16/2009 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 10/12/2009 | | 10/16/2009 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 10/12/2009 | | |
Tim Frost
|
|
|
plan mod rec'd 3 copies of plans
|
INSP-Sprinkler Rough-in | 10/2/2009 | 10/5/2009 | 10/5/2009 | A | PASS |
Troy Cobbley
|
|
|
The new PIV piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2009 | 10/2/2009 | 10/2/2009 | P | PART |
Troy Cobbley
|
|
|
Todays inspection completed the first floor high area which is ok to cover but the piping addition will need to be shown on the resubmittals. I also inspected the basement which will need to be resubmitted due to changes and overspaced pendants. The pendants have been calculated for 121 square feet per head but many exceed that. I gave the ok to cover on the piping over the offices along the north basement wall but head spacing will have to conform to the resubmitted plans when approved. The underground pipe type and size does not match approved plans. I asked Trent to please reflect the changes on the resubmittals.
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2009 | 10/2/2009 | 10/1/2009 | A | CANC |
Troy Cobbley
|
|
|
Please call 15 min prior to insppection Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|
INSP-Sprinkler Rough-in | 9/29/2009 | 9/30/2009 | 9/30/2009 | P | PART |
Troy Cobbley
|
|
|
Today's inspection only covered the first floor piping. First floor piping can be covered except the piping in the central high area. This is because an additional branch line and upright sprinkler heads have been added in this area which is remote area #1 and may require modifications to the hydraulic calculations. Also, the upright sprinkler heads in this area shown on the plan were to be an 11.2 K factor. The upright heads installed are 5.6 K factor. See plans for a single wall location that is blocking upright sprinkler coverage. Access needs to be provided to the interior of the exterior canopies for verification of correct dry sidewall sprinkler head installation. The basement system has not been inspected due to time constraints.
|
Issue and Print Permit | | | 8/31/2009 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/28/2009 | | 8/28/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2009 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/28/2009 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/28/2009 | | 8/28/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/28/2009 | | DONE |
|
|
|
Called Trent Bice and told him that permit is ready & fees due///8-28-09 @ 2:05pm BAS
|
Plan resubmittals received | | | 8/27/2009 | | |
Tim Frost
|
|
|
rec'd 3 copies of plans and app
|
Plan assigned to (Tim) | 8/11/2009 | | 8/17/2009 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/17/2009 | | 8/17/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/17/2009 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 8/17/2009 | | DONE |
|
|
|
left message w michelle for trent at ###-#### - permit was denied - needs to be picked up and resubmitted
|
Application received | | | 8/11/2009 | | |
|
|
|
|