Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberFIR09-00494
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 320 N ALLUMBAUGH
Project NameDetox Center
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of a new wet pipe system to protect a new wood framed one-story building. A new 6" underground supply will feed a new wet pipe sprinkler system. The system supplied new quick response sprinklers in a modified grid layout.

(Region Four Substance Abuse and Mental Health Crisis Center) - To construct a 9,189 sq. ft. building for use as and "I-2" occupancy care & treatment facility. This building is fully sprinklered as required for occupancy use group. Work includes perimeter footings, foundation, floor/wall/roof construction, interior walls to create rooms & support areas for short-term stay / treatment rooms, staff observation and work stations and accessible restrooms & bathing facilities throughout building; installation of electrical, mechanical, plumbing, sprinkler & alarm systems, interior & exterior finishes & millwork; and all associated site work. drs (CUP08-00139) (DRH08-00404)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/8/2010 DONE
Plans sent to scanning.
INSP-Final Inspection2/23/20102/24/20102/24/2010APASS
DetailsTroy Cobbley
Permit finaled. Forward flush passed.
INSP-Final Inspection2/23/20102/23/20102/23/2010PNR
DetailsForrest France
Partial inspection- Noted three obstructed pendent heads- one each at a storage room, isolation room, and detox room, need to complete forward flow test, missing the cover at the flow switch, two curtains at the womens sleep room are not installed, project related fire alarm permit is not yet finaled- however sprinkler riser monitoring tested okay.
INSP-Sprinkler Rough-in/Hydro2/17/20102/17/20102/17/2010APASS
DetailsTroy Cobbley
Overhead hydro test passed.
INSP-Sprinkler Rough-in2/1/20102/1/20102/1/2010PPASS
DetailsTroy Cobbley
The sprinkler piping above the gridded areas can be covered except for the small room with a grid ceiling in the west end of the building.
INSP-Sprinkler Rough-in12/30/200912/30/200912/30/2009PPASS
DetailsTroy Cobbley
See the lasted version of the city approved plans for additional areas where the hardlid ceilings can be installed and cover the sprinkler piping.
Issue and Print Permit  12/29/2009 DONE
DetailsTisha Gallop
Telephone call  12/28/2009 DONE
Details
t/c w trent at ###-#### - permit (plan mod) ready and fees given
Permit Ready to Issue  12/28/2009 DONE
INSP-Sprinkler Rough-in12/15/200912/16/200912/16/2009APASS
DetailsTroy Cobbley
See the city approved plans for additional rooms where piping is approved for cover. I spoke to the sprinkler fitter Scott and the project superintendant with EKC about the need for the plans to be resubmitted and the possibility of a stop work order if piping was covered in rooms that had not been approved for cover. All parties agreed the plans would be resubmitted immediately.
Inspection12/11/200912/11/200912/11/2009ADONE
DetailsTroy Cobbley
See the city approved plans for locations where the hardlids can be installed. These are the only locations where piping was inspected. Plans need to be resubmitted for approval that reflect the actual installation. Additional fitting have been installed, pipe re-routed and pipe sizing has been changed.
Issue and Print Permit  10/22/2009 DONE
Plan assigned to (Tim)9/10/2009 10/16/2009 DONE
DetailsTim Frost
10/16/2009 14:21:22 TRF - activity updated through activity FIRA22 from case FIR09-00494.
Plan resubmittals received  10/16/2009  
DetailsTisha Gallop
received three copies of application, submittal documents and plan sheets 1 & 2; taken to Fire Review
Plan assigned to (Tim)10/16/2009 10/16/2009 DONE
DetailsTim Frost
10/16/2009 14:21:22 TRF - activity updated through activity FIRA22 from case FIR09-00494.
Sprinkler Plan Check10/16/2009 10/16/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  10/16/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire10/16/2009 10/16/2009 DONE
Details
Telephone call  10/16/2009 DONE
Details
t/c w trent at ###-#### - permit ready and fees given
Permit Ready to Issue  10/16/2009 DONE
Details
Plan assigned to (Tim)9/29/2009 9/30/2009 DONE
DetailsTim Frost
Sprinkler Plan Check9/30/2009 9/30/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Miscellaneous action  9/30/2009 DONE
Emailed Review
Telephone call  9/30/2009 DONE
Details
t/c w trent at ###-#### - permit denied - needs to be picked up and resubmitted
Plan resubmittals received  9/29/2009  
DetailsTisha Gallop
received three copies of application, submittal documents and plan sheets 1 & 2; taken to fire review
Plan resubmittals received  9/23/2009 DONE
received 4 resubmitted fire applications and 3 sets of plans sent to Tim Frost in fire.
Plan assigned to (Tim)9/23/2009 9/23/2009 DONE
DetailsTim Frost
09-29-09 Resub
Sprinkler Plan Check9/23/2009 9/23/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Miscellaneous action  9/23/2009  
DetailsTim Frost
Emailed review to Trent
Telephone call  9/23/2009 DONE
Details
t/c w trent at ###-#### - permit denied - needs to be picked up and resubmitted
Telephone call  9/10/2009 DONE
Details
left vm for trent at ###-#### - permit denied - needs to be picked up and resubmitted
Plan assigned to (Tim)8/18/2009 9/10/2009 DONE
DetailsTim Frost
9/10/2009 10:36:31 TRF - activity updated through activity FIRA22 from case FIR09-00494.
Sprinkler Plan Check9/10/2009 9/10/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  8/20/2009 FAIL
DetailsTim Frost
Application received  8/18/2009