INSP-Final Inspection | 9/3/2009 | 9/3/2009 | 9/3/2009 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover but prior to final the insulation at deck, located above the water heater, needs to be re-attached to the deck since it is obstructing the existing upright sprinklers. This will be checked at the final and Bruce with Commercial Fire was notified.
|
INSP-Final Inspection | 9/2/2009 | 9/2/2009 | 9/2/2009 | P | FAIL |
Troy Cobbley
|
|
|
No city approved plans on site. Bruce said he would deliver them later.
|
Issue and Print Permit | | | 8/26/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 8/24/2009 | | 8/25/2009 | | DONE |
Tim Frost
|
|
|
8/25/2009 09:57:27 TRF - activity updated through activity FIRA22 from case FIR09-00495.
|
Sprinkler Plan Check | 8/25/2009 | | 8/25/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2009 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/25/2009 | | |
|
|
|
|
Inspection Record Card- Fire | 8/25/2009 | | 8/25/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/25/2009 | | DONE |
|
|
|
Called and left message for Brook that permit is ready///8-25-09 @ 11:10am BAS
|
Plan resubmittals received | | | 8/24/2009 | | |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/20/2009 | | 8/20/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/20/2009 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 8/18/2009 | | 8/19/2009 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 8/19/2009 | | DONE |
|
|
|
Asked Brook to call me. She has too many heads off of 1 1/4" pipe for ordinary hazard unless there are self-closing doors.
|
Application received | | | 8/18/2009 | | |
|
|
|
|