INSP-Final Inspection | 10/13/2009 | 10/14/2009 | 10/14/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 9/1/2009 | 9/1/2009 | 9/2/2009 | A | PART |
Forrest France
|
|
|
Overhead work okayed for cover.
|
INSP-Sprinkler Rough-in/Hydro | 8/27/2009 | 8/27/2009 | 8/27/2009 | A | PART |
Forrest France
|
|
|
Overhead work per the scope of permit at the tenant remodel is good for cover at the drop ceilings.
|
Issue and Print Permit | | | 8/26/2009 | | DONE |
|
|
|
|
Application received | | | 8/25/2009 | | |
|
|
|
|
Plan assigned to (Tim) | 8/25/2009 | | 8/25/2009 | | DONE |
Tim Frost
|
|
|
8/25/2009 10:21:38 TRF - activity updated through activity FIRA22 from case FIR09-00508.
|
Sprinkler Plan Check | 8/25/2009 | | 8/25/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 8/25/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2009 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/25/2009 | | |
|
|
|
|
Inspection Record Card- Fire | 8/25/2009 | | 8/25/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/25/2009 | | DONE |
Barbara Stitt
|
|
|
Called and talked with Tom and told him that permit is ready & fees due///8-25-09 @ 11:15am BAS
|