Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberFIR09-00513
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC13522
ePlanReview 
Description
Fire Sprinkler System: C13522 B16 SCG Remodel, work consists of demo. (3) heads and relocating (11) heads.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/1/200912/2/200912/2/2009APASS
DetailsForrest France
Remainder of fire sprinkler work and correction item verified for completion, fire sprinkler permit okay for final.
Sprinkler Plan Check10/2/2009 10/2/2009 PASS
DetailsTroy Cobbley
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  10/2/2009 DONE
DetailsTim Frost
CHANGE STATUS TO (ISS)  10/2/2009 DONE
INSP-Final Inspection9/29/200910/1/200910/1/2009APART
DetailsForrest France
Overhead fire sprinkler modifications at the drop ceilings are okay for cover, noted one additional head to be changed to match response/type of existing sprinklers. Final pending ceiling tile and escutcheons.
INSP-Sprinkler Rough-in9/22/20099/23/20099/23/2009APART
DetailsForrest France
See approved plan set for annotations indicating areas okay for cover, ceiling grid and drops are not yet installed at some locations, new heads must match response type of existing.
PLANS/APPL TAKEN TO FRONT DESK  9/21/2009  
DetailsTroy Cobbley
CHANGE STATUS TO (ISS)  9/21/2009 DONE
Details
1st review completed  9/9/2009 DONE
Sprinkler Plan Check9/9/2009 9/9/2009 PASS
Details
Approved per site review by Troy Cobbley
PLANS TAKEN FRONT DESK ALARM  9/9/2009 DONE
Plan assigned to (Scott)  8/26/2009 DONE
DetailsSam Rogers
This permit was created on the web by Paul Marcolina
Plan assigned to (SAM)  8/26/2009 DONE