INSP-Final Inspection | 12/1/2009 | 12/2/2009 | 12/2/2009 | A | PASS |
Forrest France
|
|
|
Remainder of fire sprinkler work and correction item verified for completion, fire sprinkler permit okay for final.
|
Sprinkler Plan Check | 10/2/2009 | | 10/2/2009 | | PASS |
Troy Cobbley
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2009 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/2/2009 | | DONE |
|
|
|
|
INSP-Final Inspection | 9/29/2009 | 10/1/2009 | 10/1/2009 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications at the drop ceilings are okay for cover, noted one additional head to be changed to match response/type of existing sprinklers. Final pending ceiling tile and escutcheons.
|
INSP-Sprinkler Rough-in | 9/22/2009 | 9/23/2009 | 9/23/2009 | A | PART |
Forrest France
|
|
|
See approved plan set for annotations indicating areas okay for cover, ceiling grid and drops are not yet installed at some locations, new heads must match response type of existing.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2009 | | |
Troy Cobbley
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/21/2009 | | DONE |
|
|
|
|
1st review completed | | | 9/9/2009 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/9/2009 | | 9/9/2009 | | PASS |
|
|
|
Approved per site review by Troy Cobbley
|
PLANS TAKEN FRONT DESK ALARM | | | 9/9/2009 | | DONE |
|
|
|
|
Plan assigned to (Scott) | | | 8/26/2009 | | DONE |
Sam Rogers
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (SAM) | | | 8/26/2009 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|