INSP-Final Inspection | 9/21/2009 | 9/23/2009 | 9/23/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work okayed for final, inspection passed.
|
CHANGE STATUS TO (ISS) | | | 9/21/2009 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2009 | | |
|
|
|
|
Plan assigned to (Scott) | | | 8/27/2009 | | DONE |
Sam Rogers
|
|
|
This permit was created on the web by Paul Marcolina
|
Plan assigned to (SAM) | | | 8/27/2009 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|
Sprinkler Plan Check | 8/27/2009 | | 8/27/2009 | | PASS |
Scott Arellano
|
|
|
Plan review passed
|