INSP-Final Inspection | 12/23/2009 | 12/24/2009 | 12/24/2009 | A | PASS |
Forrest France
|
|
|
Fire sprinkler final inspection passed, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 10/26/2009 | 10/26/2009 | 10/26/2009 | A | PART |
Forrest France
|
|
|
Final pending grid ceilings, tile and escutcheons.
|
INSP-Sprinkler Rough-in | 10/21/2009 | 10/21/2009 | 10/21/2009 | P | PART |
Forrest France
|
|
|
Added pendent in the concealed combustible space at the second level is approved for cover, remainder of items on C/N are not yet finished.
|
INSP-Sprinkler Rough-in/Hydro | 10/15/2009 | 10/15/2009 | 10/15/2009 | P | PART |
Troy Cobbley
|
|
|
See the city approved quick permit plans for specific areas that are ok to cover such as the stairs and a small soffit. The ceiling t grid neds installed so that pendant placement can be verified. Also on the second floor mechanical room an existing pendant head is now blocked by a new plumbing pipe and also on the second floor a wall has been built that forms a combustible concealed space that will require protection.
|
Issue and Print Permit | | | 9/21/2009 | | DONE |
|
|
|
|
Application received | | | 9/17/2009 | | |
|
|
|
|
Sprinkler Plan Check | 9/17/2009 | | 9/17/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/17/2009 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/17/2009 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/17/2009 | | 9/17/2009 | | DONE |
|
|
|
|
Telephone call | | | 9/17/2009 | | DONE |
|
|
|
t/c w don curtis at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/17/2009 | | DONE |
|
|
|
|
Pending Assignment by SAM | 9/17/2009 | | | | |
|
|
|
|