Miscellaneous action | | | 3/8/2010 | | DONE |
|
|
|
Plans sent to scanning.
|
INSP-Final Inspection | 1/29/2010 | 2/1/2010 | 2/1/2010 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/29/2010 | 1/29/2010 | 1/29/2010 | P | CANC |
Troy Cobbley
|
|
|
Rescheduled for Monday.
|
INSP-Sprinkler Rough-in | 1/12/2010 | 1/12/2010 | 1/12/2010 | P | PASS |
Troy Cobbley
|
|
|
The remaining sprinkler piping for the first and second floor elevator lobbys are ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 12/31/2009 | 1/4/2010 | 1/4/2010 | A | PART |
Troy Cobbley
|
|
|
All sprinkler piping is ok to cover except the elevator lobby in the southeast corner of the second floor. In this location, I noted overspaced upright and pendant heads and the 1 1/4" branchline needs a hanger.
|
INSP-Sprinkler Rough-in | 11/5/2009 | 11/6/2009 | 11/6/2009 | P | PASS |
Troy Cobbley
|
|
|
The restroom sprinkler piping can be covered. The insulation has been re-attached to the deck and one upright sprinkler head has been added in the restroom.
|
INSP-Sprinkler Rough-in | 11/5/2009 | 11/6/2009 | 11/6/2009 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for the hardlid areas where the sprinkler piping can be covered. Insulation needs to be re-attached to the roof deck in the restrooms and one upright sprinkler head needs to be added near the doorway in one restroom to continue coverage that has been blocked by a full height wall.
|
Issue and Print Permit | | | 9/30/2009 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/28/2009 | | 9/28/2009 | | DONE |
|
|
|
|
Telephone call | | | 9/28/2009 | | DONE |
|
|
|
t/c w don curtis at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 9/28/2009 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/24/2009 | | 9/25/2009 | | DONE |
Tim Frost
|
|
|
9/25/2009 17:03:19 TRF - activity updated through activity FIRA22 from case FIR09-00575.
|
Sprinkler Plan Check | 9/25/2009 | | 9/25/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2009 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 9/24/2009 | | |
|
|
|
received three copies of application, submittal documents and plan sheets A1.0, A7.0, A7.1; taken to Fire review
|
Plan assigned to (Tim) | 9/18/2009 | | 9/23/2009 | | DONE |
Tim Frost
|
|
|
10-02-09 New
|
Sprinkler Plan Check | 9/23/2009 | | 9/23/2009 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/23/2009 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/23/2009 | | DONE |
|
|
|
Emailed comments to Don Curtis
|
Telephone call | | | 9/23/2009 | | DONE |
|
|
|
t/c w don curtis at ###-#### - permit denied - needs to be picked up and resubmitted
|
Application received | | | 9/18/2009 | | |
|
|
|
|
Pending Assignment by SAM | 9/18/2009 | | 9/18/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
9/18/2009 16:00:56 ALR - activity updated through activity FIRA158 from case FIR09-00575.
|